In-house production and outsourcing under different discount schemes on the total outsourcing cost

被引:0
作者
Lingfa Lu
Liqi Zhang
Jinwen Ou
机构
[1] Zhengzhou University,School of Mathematics and Statistics
[2] Henan Agricultural University,College of Information and Management Science
[3] Jinan University,Department of Administrative Management
来源
Annals of Operations Research | 2021年 / 298卷
关键词
Production scheduling; Outsourcing; Discount scheme; NP-hardness; Algorithm;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper we consider a coordinated in-house production scheduling and outsourcing model, where a manufacturer might outsource part of the production to a subcontractor so as to achieve a tight production due date. The manufacturer pays a specific outsourcing cost for each job that is outsourced. To encourage the manufacturer to outsource more jobs, the subcontractor provides a specific discount scheme on the total outsourcing cost. Previous studies focus on the balance between in-house production performance and the total outsourcing cost. Our model is the first to investigate the impact on the manufacturer’s decision-making under different discount schemes on the total outsourcing cost. Four distinct discount schemes on the total outsourcing cost are studied. We either show the intractability of those problems, or provide efficient exact or approximation algorithms.
引用
收藏
页码:361 / 374
页数:13
相关论文
共 46 条
  • [1] Bartal Y(2000)Multiprocessor scheduling with rejection SIAM Journal on Discrete Mathematics 13 64-78
  • [2] Leonardi S(2011)Two-machine flow shop scheduling problem with an outsourcing option European Journal of Operational Research 213 66-72
  • [3] Spaccamela AM(2016)Min-max regret version of a scheduling problem with outsourcing decisions under processing time uncertainty European Journal of Operational Research 252 367-375
  • [4] Sgall J(2002)Advanced planning and scheduling with outsourcing in manufacturing supply chain Computer & Industrial Engineering 43 351-374
  • [5] Stougie L(2008)Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed European Journal of Operational Research 186 931-952
  • [6] Choi BC(2008)Single machine scheduling with outsourcing allowed International Journal of Production Economics 101 623-634
  • [7] Chung JB(1986)A generalized quantity discount pricing model to increase supplier’s profits Management Science 32 1177-1185
  • [8] Choi BC(2012)Dynamic lot sizing with all-units discount and resales Naval Research Logistics 59 230-243
  • [9] Chung KH(2008)The unbounded parallel batch machine scheduling with release dates and rejection to minimize makespan Theoretical Computer Science 396 283-289
  • [10] Lee YH(2016)Faster algorithms for single machine scheduling with release dates and rejection Information Processing Letters 116 503-507