Selecting the Startup Option for the Surgut GRES-2 800-MW Power Unit in the Absence of Its Own Steam Source

被引:0
作者
A. V. Skuratov
V. I. Gombolevskii
M. V. Lazarev
A. S. Shabunin
P. A. Berezinets
Yu. S. Vasil’konov
A. N. Sinel’nikov
S. G. Filippov
机构
[1] All-Russia Thermal Engineering Institute (VTI),
[2] Surgut GRES-2 Power Plant,undefined
[3] Branch of PAO Unipro,undefined
来源
Thermal Engineering | 2023年 / 70卷
关键词
startup from zero; steam power unit; technical solutions; external steam supply; heat recovery steam generator calculations; combined cycle unit; tests;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:1102 / 1107
页数:5
相关论文
共 8 条
[1]  
Gombolevskii V. I.(1997)Commercial tests of the start-up of 800-MW units with TGMP-204KhL boilers at Surgut District Power Station 2 without using steam from an independent source Therm. Eng. 44 695-699
[2]  
Kolbasnikov A. V.(undefined)undefined undefined undefined undefined-undefined
[3]  
Shvarts A. L.(undefined)undefined undefined undefined undefined-undefined
[4]  
Shmukler B. I.(undefined)undefined undefined undefined undefined-undefined
[5]  
Sokolov V. V.(undefined)undefined undefined undefined undefined-undefined
[6]  
Glusker B. N.(undefined)undefined undefined undefined undefined-undefined
[7]  
Pichugin E. D.(undefined)undefined undefined undefined undefined-undefined
[8]  
Bulgakov A. V.(undefined)undefined undefined undefined undefined-undefined