Status of the dam at the Krasnoyarsk HPP after 40 years of service
被引:0
作者
:
Epifanov A.P.
论文数:
0
引用数:
0
h-index:
0
机构:
JSC Krasnoyarskaya GÉS, Krasnoyarsk
JSC Krasnoyarskaya GÉS, Krasnoyarsk
Epifanov A.P.
[
1
]
Chupin G.A.
论文数:
0
引用数:
0
h-index:
0
机构:
Subsidiary of the JSC Rus-inzhiniring, Krasnoyarsk
JSC Krasnoyarskaya GÉS, Krasnoyarsk
Chupin G.A.
[
2
]
Kuz'min N.G.
论文数:
0
引用数:
0
h-index:
0
机构:
JSC Krasnoyarskaya GÉS, Krasnoyarsk
JSC Krasnoyarskaya GÉS, Krasnoyarsk
Kuz'min N.G.
[
1
]
机构
:
[1]
JSC Krasnoyarskaya GÉS, Krasnoyarsk
[2]
Subsidiary of the JSC Rus-inzhiniring, Krasnoyarsk
来源
:
Power Technology and Engineering
|
2007年
/ 41卷
/ 06期
关键词
:
Construction Rule;
Downstream Face;
Counter Pressure;
Thrust Face;
Hydrotechnical Structure;
D O I
:
10.1007/s10749-007-0060-x
中图分类号
:
学科分类号
:
摘要
:
Field observations of the 40-year-old dam suggest good quality of construction-assembly work and professional operation of the power plant. © Springer Science+Business Media, Inc. 2007.