Single-machine group scheduling problems with deteriorating jobs

被引:3
作者
Ji-Bo Wang
Lin Lin
Feng Shan
机构
[1] Shenyang Institute of Aeronautical Engineering,Department of Science
来源
The International Journal of Advanced Manufacturing Technology | 2008年 / 39卷
关键词
Scheduling; Single-machine; Deteriorating jobs; Group technology;
D O I
暂无
中图分类号
学科分类号
摘要
This paper investigates single-machine scheduling problems with deteriorating jobs and the group technology (GT) assumption. By deteriorating jobs and the group technology assumption, we mean that the group setup times and job processing times are both increasing functions of their starting times, i.e., the group setup times and job processing times are both described by a function which is proportional to a linear function of time. The two objectives of scheduling problems are to minimize the makespan and the total weighted completion time, respectively. We show that these problems remain solvable in polynomial time when deterioration and group technology are considered simultaneously.
引用
收藏
页码:808 / 812
页数:4
相关论文
共 49 条
[1]  
Alidaee B(1999)Scheduling with time dependent processing times: review and extensions J Oper Res Soc 50 711-720
[2]  
Womer NK(2004)A concise survey of scheduling with time-dependent processing times Eur J Oper Res 152 1-13
[3]  
Cheng TCE(2005)Single machine scheduling with deteriorating jobs under the group technology assumption Int J Pure Appli Math 18 225-231
[4]  
Ding Q(2006)Scheduling in a contaminated area: a model and polynomial algorithms Eur J Oper Res 173 125-132
[5]  
Lin BMT(2006)Minimizing total completion time in a two-machine flow shop with deteriorating jobs Appl Math Comput 180 185-193
[6]  
Guo A-X(2005)Scheduling jobs under decreasing linear deterioration Inf Process Lett 94 63-69
[7]  
Wang J-B(2006)Flow shop scheduling with deteriorating jobs under dominating machines Omega 34 327-336
[8]  
Janiak A(2006)Flow shop scheduling problems with deteriorating jobs under dominating machines J Oper Res Soc 57 220-226
[9]  
Kovalyov MY(2006)Single machine scheduling problem with linear deterioration under group technology Int J Pure Appli Math 28 401-406
[10]  
Wang J-B(2006)Pareto and scalar bicriterion optimization in scheduling deteriorating jobs Comput Oper Res 33 746-767