Assessing the Effect of Building Information Modeling System (BIM) Capabilities on Lean Construction Performance in Construction Projects Using Hybrid Fuzzy Multi-criteria Decision-Making Methods

被引:0
作者
Elham Moballeghi
Towhid Pourrostam
Hamidreza Abbasianjahromi
Payam Makvandi
机构
[1] Islamic Azad University,Department of Civil Engineering, Centeral Tehran Branch
[2] K. N. Toosi University of Technology,Department of Civil Engineering
[3] Karaj Branch,Department of Industrial Management
[4] Islamic Azad University,undefined
来源
Iranian Journal of Science and Technology, Transactions of Civil Engineering | 2023年 / 47卷
关键词
Capability; Functionality; Building information modeling system (BIM); Lean construction; Construction projects; Fuzzy integrated multi-criteria decision-making methods;
D O I
暂无
中图分类号
学科分类号
摘要
Despite possibly higher initial costs, owners and construction management organizations have demonstrated a growing interest in implementing practices that result in improved quality and fewer risks, disputes, and waste on their projects in recent years. Therefore, to solve this problem, a new method that has been considered for design and construction is lean analysis and construction. If this design is aligned with new technologies such as building information modeling (BIM), there will be a huge change in the success of projects. Integrated and synergistic integration of the two phenomena of lean construction (LC) and BIM can reduce errors and losses. The main purpose of the present study is to determine effective parameters of the synergy of LC technique and BIM system and identifying and evaluating the most important application and infrastructure required to apply an integrated model of application of these techniques in construction projects in the country. The data were examined utilizing the combined approach of FAHP and FTOPSIS after determining the relevant capabilities of BIM and LC functions. The results showed that among the identified BIM capabilities, the ability to integrate the database with a weight of 0.201 ranks first, and the standardization function in LC with a similarity index of 0.547 is also the optimal solution. Also, the results showed that based on the similarity index (CCi) illustration of the process of how to form a plan status plan at any time, “The closest solution to the function of teamwork culture, the ability to” assess compliance with the initial objectives of the plan “The closest solution to the function of continuous improvement/construction based on quality and capability” Fast construction and Time and cost optimization “The closest solution to the function of continuous improvement/construction based on quality and capability” Energy consumption “The closest solution to the function of waste and the ability to” Build and control computer scheduling and project budgeting “The closest solution to the function of waste be.”
引用
收藏
页码:1871 / 1891
页数:20
相关论文
共 241 条
  • [51] Shariati M(2021)Comparison of behaviour between channel and angle shear connectors under monotonic and fully reversed cyclic loading Construction and Building Materials 312 undefined-undefined
  • [52] Deng H(2013)Monotonic behavior of C and L shaped angle shear connectors within steel-concrete composite beams: an experimental investigation Construction and Building Materials 17 undefined-undefined
  • [53] Fan X(2020)Significance of surface eco-protection techniques for cohesive soils slope in Selangor Steel Compos. Struct 12 undefined-undefined
  • [54] Wei G(2019)Effect of nanoparticles on the performance of polymer/surfactant flooding for enhanced oil recovery: A review Malaysia. Geotechnical and Geological Engineering 457–458 undefined-undefined
  • [55] Lin X(2022)Prediction of shear capacity of channel shear connectors using the ANFIS model Fuel 11 undefined-undefined
  • [56] Wang X(2014)A Few Shot Classification Methods Based on Multiscale Relational Networks Steel Compos Struct 7 undefined-undefined
  • [57] Si Z(2022)Lean cost analysis based on BIM modeling for construction project Applied Sciences 28 undefined-undefined
  • [58] Zhang X(2013)Forecasting Urban Land Use Change Based on Cellular Automata and the PLUS Model Appl Mech Mater undefined undefined-undefined
  • [59] Shao Q(2022)A survey on lean manufacturing implementation in a selected manufacturing industry in Iran Land undefined undefined-undefined
  • [60] Mangin S(2016)Computational investigation of the comparative analysis of cylindrical barns subjected to earthquake Int J Lean Six Sigma undefined undefined-undefined