Optimal resource allocation for anti-terrorism in protecting overpass bridge based on AHP risk assessment model

被引:0
作者
Yulong Li
Tao Wang
Xinyi Song
Guijun Li
机构
[1] Central University of Finance and Economics,School of Management Science and Engineering
[2] Georgia Institute of Technology,School of Building Construction
来源
KSCE Journal of Civil Engineering | 2016年 / 20卷
关键词
resource allocation; overpass bridge; risk; AHP; anti-terrorism; infrastructure;
D O I
暂无
中图分类号
学科分类号
摘要
Terrorist attacks on infrastructures are serious incidents in many countries. Measures to prevent terrorist attacks and minimize the damage are critical in the design of infrastructures. This paper develops an Analytic Hierarchy Process (AHP) based risk assessment model to identify the key components of the overpass bridge in terrorist attacks, and prioritizes a variety of possible attack means with multiple criteria. The AHP risk assessment model can be used to not only set the priority of protected components, but also to allocate resources to the most critical protecting methods within a limited budget. An interchange overpass bridge in Beijing, China is analysed to validate the model. The results show that the method is suitable for the optimal resource allocation in the process of the overpass bridge anti-terrorism design, the formulation of a defence strategy and the protection resource allocation scheme for the overpass bridge against a terrorist attack. The method can also be used for dynamic allocating the resources for the overpass bridge under the early warning of terrorist attacks.
引用
收藏
页码:309 / 322
页数:13
相关论文
共 64 条
[1]  
Azaiez M. N.(2007)Optimal resource allocation for security in reliability systems. European Journal of Operational Research 181 773-786
[2]  
Bier V. M.(2007)Infrastructure failure interdependencies in extreme events: Power outage consequences in the 1998 Ice Storm. Natural Hazards 41 337-358
[3]  
Chang S. E.(2010)Framework for analytical quantification of disaster resilience. Engineering Structures 32 3639-3649
[4]  
McDaniels T. L.(2007)Optimal allocation of multiple emergency service resources for protection of critical transportation infrastructure. Transportation Research Record: Journal of the Transportation Research Board 2022 1-8
[5]  
Mikawoz J.(2009)Dynamic Bayesian network for predicting the likelihood of a terrorist attack at critical transportation infrastructure facilities. Journal of Infrastructure Systems 15 31-39
[6]  
Peterson K.(2012)Fuzzy adaptive decision making model for selection balanced risk allocation. International Journal of Project Management 30 511-522
[7]  
Cimellaro G. P.(2005)Modeling cascading failures in the North American power grid. The European Physical Journal B-Condensed Matter and Complex Systems 46 101-107
[8]  
Reinhorn A. M.(1998)Pros and cons of a pushover analysis of seismic performance evaluation. Engineering structures 20 452-464
[9]  
Bruneau M.(2013)Using fuzzy multiple criteria decision making approach to enhance risk assessment for metropolitan construction projects. International Journal of Project Management 31 602-614
[10]  
Huang Y.(2004)A risk-based approach to setting priorities in protecting bridges against terrorist attacks. Risk Analysis 24 963-984