Elucidation of IS project success factors: an interpretive structural modelling approach

被引:0
作者
D. Laurie Hughes
Nripendra P. Rana
Yogesh K. Dwivedi
机构
[1] Swansea University Bay Campus,C/O School of Management
[2] Swansea University Bay Campus,Emerging Markets Research Centre (EMaRC), School of Management
来源
Annals of Operations Research | 2020年 / 285卷
关键词
Information systems; Projects; Success factors; Critical success factors; Interpretive structural modelling;
D O I
暂无
中图分类号
学科分类号
摘要
This study extends the debate surrounding the components of IS project success by reviewing success factors from the perspective of their interdependency and influence on each other. This research utilises interpretive structural modelling as the methodology and framework to develop the relationships between the selected factors. This approach is presented as a mechanism that can provide greater insight to the underlying causal interrelationships associated with IS project success and the successful transition to operations. The findings identify a number of key outcomes that have significant driving influence on other interconnected factors in the final model. This study highlights the benefits of an interpretive approach where IS factor interrelationships can be modelled to demonstrate potential influence on other connected factors thereby, increasing the chances of project success.
引用
收藏
页码:35 / 66
页数:31
相关论文
共 225 条
  • [1] Agarwal A(2003)On-line trust building in e-enabled supply chain Supply Chain Management: An International Journal 8 324-334
  • [2] Shankar R(2007)Modeling agility of supply chain Industrial Marketing Management 36 443-457
  • [3] Agarwal A(1999)Project management: Cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria International Journal of Project Management 17 337-342
  • [4] Shankar R(1996)A new framework for determining critical success/failure factors in projects International Journal of Project Management 14 141-151
  • [5] Tiwari MK(2004)Factors influencing project success: The impact of human resource management International Journal of Project Management 22 1-11
  • [6] Atkinson R(2009)Setting gates for activities in the stochastic project scheduling problem through the cross entropy methodology Annals of Operations Research 172 259-276
  • [7] Belassi W(1995)Information systems failure: The case of the London ambulance services computer aided despatch project European Journal of Information Systems 4 171-184
  • [8] Tukel OI(1998)Doomed to failure: Narratives of inevitability and conspiracy in a failed IS project Organisation Studies 19 73-88
  • [9] Belout A(2011)Effort estimates through project complexity Annals of Operations Research 186 395-406
  • [10] Gauvreau C(2013)Modeling of information security management parameters in Indian organisations using ISM and MICMAC approach Journal of Modelling in Management 8 171-189