Deteriorating jobs and learning effects on a single-machine scheduling with past-sequence-dependent setup times

被引:0
作者
Na Yin
Ji-Bo Wang
Dan Wang
Li-Yan Wang
Xiao-Yuan Wang
机构
[1] Shenyang Institute of Aeronautical Engineering,Operations Research and Cybernetics Institute, School of Science
来源
The International Journal of Advanced Manufacturing Technology | 2010年 / 46卷
关键词
Scheduling; Single machine; Deteriorating jobs; Learning effect; Setup times;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, we consider the single-machine setup times scheduling with the effects of learning and deterioration. By the effects of learning and deterioration, we mean that the actual processing time of a job depends not only on the processing times of the jobs already processed but also on its scheduled position. The setup times are proportional to the length of the already processed jobs, i.e., the setup times are past-sequence-dependent (p-s-d). We show that the problems to minimize the makespan, the total completion time, and the sum of the \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$\mathit{\delta}$\end{document}th (\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}${\mathit{\delta}} \geq 0$\end{document}) power of job completion times are polynomially solvable. We also show that the total weighted completion time minimization problem, the maximum lateness minimization problem, and the number of tardy jobs minimization problem can be solved in polynomial time under certain conditions.
引用
收藏
页码:707 / 714
页数:7
相关论文
共 58 条
[1]  
Alidaee B(1999)Scheduling with time dependent processing times: review and extensions J Oper Res Soc 50 711-720
[2]  
Womer NK(2004)A concise survey of scheduling with time-dependent processing times Eur J Oper Res 152 1-13
[3]  
Cheng TCE(2008)A state-of-the-art review on scheduling with learning effects Eur J Oper Res 188 315-329
[4]  
Ding Q(2007)Minimizing the total weighted completion time on a single machine under linear deterioration Int J Adv Manuf Technol 33 1237-1243
[5]  
Lin BMT(2007)Two-machine flowshop scheduling to minimize mean flow time under simple linear deterioration Int J Adv Manuf Technol 34 774-782
[6]  
Biskup D(2007)A bicriteria scheduling with a learning effect: total completion time and total tardiness INFOR, Inf Syst Oper Res 45 75-81
[7]  
Wu C-C(2007)Minimizing total tardiness in a scheduling problem with a learning effect Appl Math Model 31 1351-1361
[8]  
Lee W-C(2008)Minimizing the earliness/ tardiness costs on parallel machine with learning effects and deteriorating jobs: a mixed nonlinear integer programming approach Int J Adv Manuf Technol. 38 801-808
[9]  
Shiau Y-R(2009)A bicriteria parallel machine scheduling with a learning effect of setup and removal times Appl Math Model 33 1141-1150
[10]  
Shiau Y-R(2008)Some scheduling problems with deteriorating jobs and learning effects Comput Ind Eng 54 972-982