Scheduling Under Common Due Date, A Single Resource and Precedence Constraints—A Dynamic Approach

被引:0
作者
Konstantin Kogan
机构
[1] Tel-Aviv University,Department of Industrial Engineering
来源
Discrete Event Dynamic Systems | 1998年 / 8卷
关键词
scheduling; optimal control; time-decomposition methods;
D O I
暂无
中图分类号
学科分类号
摘要
This paper discusses dynamic methods for solving a class of multi-project scheduling problems in which rates of job performances are controllable and resources such as money, energy or manpower per time unit, are renewable and continuously divisible. The objective is to complete the projects as close to the common due date as possible. Two different ways of imposing sequential precedence relations between project jobs are explored by formulating two dynamic models and studying their relationships on the optimal solution. Efficient time-decomposition algorithms for finding either globally optimal schedules or lower bound guided near-optimal solutions are suggested and computationally tested.
引用
收藏
页码:353 / 364
页数:11
相关论文
共 37 条
[1]  
Arizono I.(1989)The effects of varying production rates on inventory control Journal of Operational Research Society 40 789-796
[2]  
Yokoi S.(1990)Solving resource constrained project scheduling problems by Λ* search Naval Research Logistics 37 41-84
[3]  
Ohta H.(1997)Scheduling workforce and workflow in a high volume factory Management Science 43-2 158-172
[4]  
Bell C. I.(1987)Project scheduling with re source constraints: A branch and bound approach European Journal of Operational Research 29 262-273
[5]  
Park K.(1992)Abranch and bound procedure for the multiple resource constrained project scheduling problem Management Science 38 1803-1818
[6]  
Berman O.(1983)The equivalence of local and global time-optimal control of a complex of operations International Journal of Control 38-6 1149-1165
[7]  
Larson R.(1983)An algorithm for the computer control of a flexible manufacturing system IEE Transactions 15-4 353-362
[8]  
Pinker E.(1995)A maximum principle based combined method for scheduling in a flexible manufacturing system Discrete Event Dynamic Systems 5 343-355
[9]  
Christofides N.(1996)An optimal control model for continuous-time production and setup scheduling International Journal of Production Research 34-3 715-725
[10]  
Alvarez-Valdes R.(1982)Multi project scheduling: Categorization of heuristic rule performance Management Science 28 161-172