This study considers the transfer of shared resources among multiple geographically dispersed projects. To formulate this problem, we establish a two-stage decision-making model including the local decision-making stage and the global coordination decision-making stage and develop a two-stage approach (TA) to solve this model. In the local decision-making stage, each project agent (PA) uses a beetle antenna search algorithm (BASA) to generate an initial local schedule to minimize the completion time of each individual project. In the global coordination decision-making stage, a sealed bid auction-based approach with minimizing idle times scheme is developed to transfer the shared resources and to minimize the average delay of multiple projects. The performance of the proposed method is tested on a standard set of 140 problem instances. Computational experiments show that, compared with the branch and bound algorithm and two meta-heuristic algorithms, BASA can obtain high-quality solutions in all project instances. Compared to the existing algorithm for solving the decentralized multiproject scheduling problem with resource transfers, our proposed TA method can obtain lower average project delays and total project makespans on most problem subsets. These new, best results can be used as a benchmark for other methods for solving the same problem.
引用
收藏
页码:18081 / 18100
页数:19
相关论文
共 110 条
  • [1] Lova A(2011)Analysis of scheduling schemes and heuristic rules performance in resource-constrained multi-project scheduling Ann Oper Res 102 263-286
  • [2] Tormos P(2009)A heuristic solution framework for the resource constrained (multi-) project scheduling problem with sequence-dependent transfer times Eur J Oper Res 197 492-508
  • [3] Kruger D(2010)Managing and modeling general resource transfers in (multi-) project scheduling OR Spectrum 32 369-394
  • [4] Scholl A(2013)Routing and dispatching of multiple mobile agents in integrated enterprises Int J Prod Econ 145 96-106
  • [5] Kruger D(2017)A multi-agent-based system for two-stage scheduling problem of offshore project Adv Mech Eng 9 168781401772088-369
  • [6] Scholl A(1995)Applying agent technology Appl Artif Intell 9 357-861
  • [7] Elalouf A(2006)Agent-based modeling of supply chains for distributed scheduling IEEE Trans Syst Man Cybern Part A- Syst Hum 36 847-991
  • [8] Levner E(2009)Agent-based distributed manufacturing control: a state-of-the-art survey Eng Appl Artif Intell 22 979-478
  • [9] Cheng TCE(2012)An autonomous multi-agent approach to supply chain event management Int J Prod Econ 135 468-179
  • [10] Han D(2014)Multi-agent based approach for single machine scheduling withsequence-dependent setup times and machine maintenance Appl Soft Comput 23 165-661