共 110 条
- [1] Lova A(2011)Analysis of scheduling schemes and heuristic rules performance in resource-constrained multi-project scheduling Ann Oper Res 102 263-286
- [2] Tormos P(2009)A heuristic solution framework for the resource constrained (multi-) project scheduling problem with sequence-dependent transfer times Eur J Oper Res 197 492-508
- [3] Kruger D(2010)Managing and modeling general resource transfers in (multi-) project scheduling OR Spectrum 32 369-394
- [4] Scholl A(2013)Routing and dispatching of multiple mobile agents in integrated enterprises Int J Prod Econ 145 96-106
- [5] Kruger D(2017)A multi-agent-based system for two-stage scheduling problem of offshore project Adv Mech Eng 9 168781401772088-369
- [6] Scholl A(1995)Applying agent technology Appl Artif Intell 9 357-861
- [7] Elalouf A(2006)Agent-based modeling of supply chains for distributed scheduling IEEE Trans Syst Man Cybern Part A- Syst Hum 36 847-991
- [8] Levner E(2009)Agent-based distributed manufacturing control: a state-of-the-art survey Eng Appl Artif Intell 22 979-478
- [9] Cheng TCE(2012)An autonomous multi-agent approach to supply chain event management Int J Prod Econ 135 468-179
- [10] Han D(2014)Multi-agent based approach for single machine scheduling withsequence-dependent setup times and machine maintenance Appl Soft Comput 23 165-661