共 49 条
[1]
Browne S(1990)Scheduling deteriorating jobs on a single processor Oper Res 38 495-498
[2]
Yechiali U(1990)Minimizing the makespan with late start penalties added to processing times in a single facility scheduling problem Eur J Oper Res 47 56-64
[3]
Kunnathur AS(1994)Scheduling jobs under simple linear deterioration Comput Oper Res 21 653-659
[4]
Gupta SK(1998)The complexity of scheduling starting time dependent tasks with release times Inf Process Lett 65 75-79
[5]
Mosheiov G(2005)Scheduling jobs under decreasing linear deterioration Inf Process Lett 94 63-69
[6]
Cheng TCE(2005)Single machine scheduling problems with deteriorating jobs Appl Math Comput 161 865-874
[7]
Ding Q(2007)Two-machine flowshop scheduling to minimize mean flow time under simple linear deterioration Int J Adv Manuf Technol 34 774-782
[8]
Wang JB(2008)Minimizing the earliness/tardiness costs on parallel machine with learning effects and deteriorating jobs: a mixed nonlinear integer programming approach Int J Adv Manuf Technol 38 801-808
[9]
Xia ZQ(2008)Single-machine group scheduling problems with deteriorating jobs Int J Adv Manuf Technol 39 808-812
[10]
Zhao CL(1998)Scheduling deteriorating jobs to minimize makespan Nav Res Logistics 45 511-523