共 45 条
[1]
Almada-Lobo B(2007)Single machine multi-product capacitated lot sizing with sequence-dependent setups Int J Prod Res 45 4873-4894
[2]
Klabjan D(2007)Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups J Heuristics 13 337-358
[3]
Carravilla M-A(2008)Lot sizing and furnace scheduling in small foundries Comput Operat Res 35 916-932
[4]
Oliveira J(2008)Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs Comput Operat Res 35 3644-3656
[5]
Araujo S-A(2003)Optimization approximations for capacity constrained material requirements planning Int J Prod Eco 84 115-131
[6]
Arenales M-N(2000)Rolling-horizon lot-sizing when setup times are sequence-dependent Int J Prod Res 38 2287-2308
[7]
Clark A-R(1994)On practical resource allocation for production planning and scheduling with period overlapping setups Eur Oper Res 75 275-286
[8]
Araujo S-A(1997)Lot sizing and scheduling, survey and extensions Eur J Oper Res 99 221-235
[9]
Arenales M-N(1987)Solving multi-item capacitated lot-sizing problems using variable redefinition Operat Res 35 832-848
[10]
Clark A-R(2006)Simultaneous lot sizing and scheduling for multi-product multi-level production Int J Prod Eco 104 308-316