共 66 条
[1]
Aggarwal A.(1993)Improved algorithms for economic lot-size problems Operations Research 41 549-571
[2]
Park J.K.(1984)Approximation methods for the uncapacitated dynamic lot size problem Management Science 30 1121-1140
[3]
Bitran G.B.(1982)Computational complexity of the capacitated lot size problem Management Science 28 1174-1185
[4]
Magnanti T.L.(1982)Improved heuristics for multistage requirements planning systems Management Science 28 44-56
[5]
Yanasse H.H.(2000)Stock replenishment and shipment scheduling for vendor managed inventory systems Management Science 46 217-232
[6]
Bitran G.B.(1994)A new dynamic programming algorithm for the single item capacitated dynamic lot size model Journal of Global Optimization 4 285-300
[7]
Yanasse H.H.(1988)Optimal common due date with limited completion time deviation Computers and Operations Research 15 420-426
[8]
Blackburn J.D.(1988)An Management Science 34 420-426
[9]
Millen R.A.(1973)( Management Science 20 14-21
[10]
Çetinkaya S(1992)) algorithm for the NI/G/NI/ND capacitated lot size problem Operations Research 40 342-254