共 16 条
[1]
Lindsley W.B.(1991)Time and product variety competition in the book distribution industry J. Oper. Manag. 10 344-360
[2]
Blackburn J.D.(2004)Simulation based cause and effect analysis of cycle time and WIP in semiconductor wafer fabrication J. I. Eng. 44 53-55
[3]
Elrod T.(2010)The impact of E-collaboration system on cycle time reduction: a study at Alhassan industry city Int. J. Financ. Econ. 41 51-59
[4]
Qi C.(2008)Six Sigma: definition and underlying theory J. Oper. Manag. 26 536-554
[5]
Tang T.K.(2012)Towards an integrated framework for Lean Six Sigma application: lessons forn the airline industry Total Qual. Manag. 23 397-415
[6]
Almashaqba M.S.(2009)Benchmarking Six Sigma application in Brazil: best practices in the use of the methodology, Benchmark Int. J. 16 124-134
[7]
Zyadat A.(2006)Lean-Six Sigma: tools for rapid cycle cost reduction Healthc. Financ. Manag. 60 96-98
[8]
Schroeder R.G.(undefined)undefined undefined undefined undefined-undefined
[9]
Linderman K.(undefined)undefined undefined undefined undefined-undefined
[10]
Liedtke C.(undefined)undefined undefined undefined undefined-undefined