Experimental research on water inrush in tunnel construction

被引:0
作者
De-xian Liang
Zhen-quan Jiang
Shu-yun Zhu
Qiang Sun
Zi-wei Qian
机构
[1] China University of Mining and Technology,School of Resources and Earth Science
[2] China University of Mining and Technology,State Key Laboratory for Geomechanics and Deep Underground Engineering
来源
Natural Hazards | 2016年 / 81卷
关键词
Physical simulation; Accumulating period; Instability period; Cusp catastrophe model; Criterion;
D O I
暂无
中图分类号
学科分类号
摘要
With the rapid development of underground construction, a large number of tunnels will be built at the positions where unprecedentedly complex geological conditions exist. It results in more and more tunnel water inrush accidents. Study on water inrush becomes more and more important. The water inrush in tunnel construction is the results of water–rock coupling interaction. The surrounding rock stress state changes continuously in tunnel excavation, so recording the data of stress, displacement and water pressure in the whole process is essential to the research of the tunnel water inrush mechanism. By the physical simulation experiment of water inrush in tunnel excavation, the change laws of stress, displacement and water pressure were analyzed: The displacement increased gradually at the beginning, but sharply increased when excavation reached the water-bearing structure; the stress concentrated in the early period and released later; the water pressure increased sharply firstly and stabilized afterward with slow but continuous decrease. The whole water inrush process can be divided into two periods: accumulating period and instability period. The accumulating period was characterized by the stable development with elastic potential energy and rock damage accumulating continuously, while the instability period performed state’s sudden changing. Based on the analysis above, actual engineering cases and cusp catastrophe theory, the criteria of water inrush were established and verified with the experimental data.
引用
收藏
页码:467 / 480
页数:13
相关论文
共 54 条
[1]  
Bu W(2009)Research on effect of fault dip on fault activation and water inrush of coal floor Chin J Rock Mech Eng 28 386-394
[2]  
Mao X(2010)Physical simulation modeling of roof water inrush in underwater mining J China Univ Min Technol 39 854-859
[3]  
Chen H(2010)Experimental study on a geo-mechanical model of a high arch dam Int J Rock Mech Min Sci 47 299-306
[4]  
Li X(2009)Experimental research on fracture evolution law of water-resisting strata in coal seam floor above aquifer Chin J Rock Mech Eng 28 336-341
[5]  
Liu A(2014)Tunnelling through weak and fragile rocks of Himalayas Int J Min Sci Technol 24 783-790
[6]  
Fei WP(2007)3D solid-liquid coupling experiment study into deformation destruction of coal stope J Liaoning Tech Univ 26 520-523
[7]  
Zhang L(2007)Simulation theory and method of 3D solid-liquid coupling J Liaoning Tech Univ 26 204-206
[8]  
Zhang R(2002)Problems of high stress rock burst and water outburst and countermeasures in deep and long tunnel Chin J Rock Mech Eng 21 1319-1323
[9]  
Feng MM(2011)Construction license mechanism and its application based on karst water inrush risk evaluation Chin J Rock Mech Eng 7 1345-1355
[10]  
Mao XB(2013)Risk assessment of water inrush in karst tunnels based on attribute synthetic evaluation system Tunn Undergr Space Technol 38 50-58