Development and adoption of multichannel measuring systems for startup-adjustment monitoring of the equipment in power-generating units under construction at nuclear power plants with VVÉR-1000 reactors

被引:0
作者
A. V. Seleznev
V. U. Khairetdinov
M. M. Paderov
V. V. Tarkhanov
机构
来源
Atomic Energy | 2005年 / 99卷
关键词
Power Plant; Present Article; Nuclear Power Plant; Technical Problem; Multichannel Measuring;
D O I
暂无
中图分类号
学科分类号
摘要
The problem of developing multichannel measuring systems for nuclear power plants with VVÉR-1000 reactors involves many technical problems. In the course of solving these problems, different variants of the construction of distributed systems were tested. In the present article, the most successful configuration, tested on four units of a nuclear power plant, is described.
引用
收藏
页码:897 / 900
页数:3
相关论文
empty
未找到相关数据