共 8 条
[1]
Breit J(2004)An improved approximation algorithm for two-machine flow shop scheduling with an availability constraint Inf Process Lett 90 273-278
[2]
Cheng TCE(2000)An improved heuristic for two-machine flowshop scheduling with an availability constraint Oper Res Lett 26 223-229
[3]
Wang G(2006)Scheduling two-stage hybrid flow shop with availability constraints Comput Oper Res 33 1399-1419
[4]
Hamid A(1954)Optimal two- and three-stage production schedules with setup times included Res Log Q 1 61-68
[5]
Artiba A(1997)Minimizing the makespan in the two-machine flow shop scheduling problem with an availability constraint Oper Res Lett 20 129-139
[6]
Johnson SM(1999)Two-machine flowshop scheduling with availability constraints Eur J Oper Res 114 420-429
[7]
Lee CY(undefined)undefined undefined undefined undefined-undefined
[8]
Lee CY(undefined)undefined undefined undefined undefined-undefined