The use of Building Information Modelling in the circular economy context: Several models and a new dimension of BIM (8D)

被引:48
作者
Charef, Rabia
机构
来源
CLEANER ENGINEERING AND TECHNOLOGY | 2022年 / 7卷
关键词
Building Information Modelling (BIM); Circular Economy; Project Information Model (PIM); Asset Information Model (AIM); Deconstruction Information Model (DIM); 8D BIM; BIM dimension; Circularity Earthen construction; Common Data Environment (CDE); CONSTRUCTION; DEMOLITION; DESIGN;
D O I
10.1016/j.clet.2022.100414
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The use of Building Information Modelling (BIM) to improve projects' efficiency, starts to be a well-known practice, advocated by many governments. Despite the increasing interest among researchers in the use of BIM for managing end-of-life (EOL) activities, practitioners are still doubtful. Moreover, the potential of BIM to facilitate circular economy (CE) adoption is a research area still in its infancy. An extensive literature review was conducted to explore how BIM is used throughout the asset lifecycle and what are the various BIM dimensions. Then, an inductive and qualitative survey, using semi-structured interviews was conducted. The aim of this research was to present the various BIM models developed throughout the asset lifecycle in the context of CE and to define what the content of the deconstruction information model (DIM) could be. Based on the qualitative analysis of the data, three types of findings present the practitioners' views. First, a process illustrates the sustainable EOL in the context of BIM and CE. Secondly, the three models created throughout the asset lifecycle are presented. Lastly, the content of the model proposed for the management of the EOL activities is detailed. Conclusively, an eighth dimension is proposed associated with the EOL activities and further areas of research are suggested.
引用
收藏
页数:12
相关论文
共 56 条
[1]  
Amar H., 2018, MANAGING RISKS VIRTU
[2]  
[Anonymous], 2012, Sustainable Resource Efficient Cities: Making It Happen
[3]  
[Anonymous], 2014, PAS 1192-3:2014
[4]  
[Anonymous], 2012, 1 UK ACAD C BUILDING
[5]  
[Anonymous], 2009, Building information modeling
[6]  
[Anonymous], RACONTEUR
[7]   Why do some inter-organisational collaborations in healthcare work when others do not? A realist review [J].
Aunger, Justin Avery ;
Millar, Ross ;
Greenhalgh, Joanne ;
Mannion, Russell ;
Rafferty, Anne-Marie ;
McLeod, Hugh .
SYSTEMATIC REVIEWS, 2021, 10 (01)
[8]  
Bekr G.A., 2017, RESILIENT STRUCT SUS, P1
[9]   Automating the creation of building information models for existing buildings [J].
Bortoluzzi, Brandon ;
Efremov, Ivan ;
Medina, Clarice ;
Sobieraj, Daniel ;
McArthur, J. J. .
AUTOMATION IN CONSTRUCTION, 2019, 105
[10]  
Charef Rabia, 2019, IOP Conference Series: Earth and Environmental Science, V225, DOI 10.1088/1755-1315/225/1/012067