A dynamic scheduling holon for manufacturing orders

被引:48
作者
Sousa, P [1 ]
Ramos, C [1 ]
机构
[1] Inst Super Engn Porto, IPP, Dept Informat Engn, P-4200 Oporto, Portugal
关键词
intelligent manufacturing systems; holonic manufacturing systems;
D O I
10.1023/A:1008807726981
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper deals with a new architecture and negotiation protocol for the dynamic scheduling of manufacturing systems. The architecture is based on two paradigms: multi-agent systems and holonic systems. The main contribution in the architecture is the existence of holons representing tasks together with holons representing resources. The well-known contract net protocol has been adapted to handle temporal constraints and to deal with conflicts. It also deals with conflict situations, namely with the case of the 'indecision problem'. This approach assumes that deadlines are the most important constraints to consider. (C) 1998 Chapman & Hall.
引用
收藏
页码:107 / 112
页数:6
相关论文
共 12 条
  • [1] [Anonymous], P 1 EUR WORKSH AG OR
  • [2] NEGOTIATION AS A METAPHOR FOR DISTRIBUTED PROBLEM-SOLVING
    DAVIS, R
    SMITH, RG
    [J]. ARTIFICIAL INTELLIGENCE, 1983, 20 (01) : 63 - 109
  • [3] DAVIS R, 1980, 73 SIGART, P42
  • [4] Koestler A., 1967, The Ghost in the Machine
  • [5] NILSSON N, 1981, REPORT SRI INT
  • [6] Ramos C, 1995, INDUSTRIAL AND ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE AND EXPERT SYSTEMS (IEA/AIE 95), P745
  • [7] RAMOS C, 1994, IEEE INT CONF ROBOT, P3161, DOI 10.1109/ROBOT.1994.351084
  • [8] RAMOS C, 1995, IEEE INT S ASS TASK, P259
  • [9] ROCHA J, 1996, DATA KNOWLEDGE SYSTE, P233
  • [10] SOLBERG J, 1993, P IEEE, V81