首页
学术期刊
论文检测
AIGC检测
热点
更多
数据
Pipe reduces installation and maintenance costs
被引:0
|
作者
:
不详
论文数:
0
引用数:
0
h-index:
0
不详
机构
:
来源
:
POLLUTION ENGINEERING
|
2000年
/ 32卷
/ 07期
关键词
:
D O I
:
暂无
中图分类号
:
X [环境科学、安全科学];
学科分类号
:
08 ;
0830 ;
摘要
:
引用
收藏
页码:50 / 51
页数:2
相关论文
共 50 条
[1]
Pipe installation, maintenance, and rehabilitation
Anon
论文数:
0
引用数:
0
h-index:
0
Anon
Public Works,
2001,
132
(05):
[2]
Grassland reconstruction in a factory yard increases biodiversity and reduces costs of installation and maintenance
Csonka, Anna Cseperke
论文数:
0
引用数:
0
h-index:
0
机构:
Eotvos Lorand Univ, Inst Biol, Doctoral Sch Biol, Pazmany Peter setany 1-C, H-1117 Budapest, Hungary
Ctr Ecol Res, Inst Ecol & Bot, Alkotmany u 2-4, H-2163 Vacratot, Hungary
Eotvos Lorand Univ, Inst Biol, Doctoral Sch Biol, Pazmany Peter setany 1-C, H-1117 Budapest, Hungary
Csonka, Anna Cseperke
Torok, Katalin
论文数:
0
引用数:
0
h-index:
0
机构:
Ctr Ecol Res, Inst Ecol & Bot, Alkotmany u 2-4, H-2163 Vacratot, Hungary
Eotvos Lorand Univ, Inst Biol, Doctoral Sch Biol, Pazmany Peter setany 1-C, H-1117 Budapest, Hungary
Torok, Katalin
Csecserits, Aniko
论文数:
0
引用数:
0
h-index:
0
机构:
Ctr Ecol Res, Inst Ecol & Bot, Alkotmany u 2-4, H-2163 Vacratot, Hungary
Eotvos Lorand Univ, Inst Biol, Doctoral Sch Biol, Pazmany Peter setany 1-C, H-1117 Budapest, Hungary
Csecserits, Aniko
Halassy, Melinda
论文数:
0
引用数:
0
h-index:
0
机构:
Ctr Ecol Res, Inst Ecol & Bot, Alkotmany u 2-4, H-2163 Vacratot, Hungary
Eotvos Lorand Univ, Inst Biol, Doctoral Sch Biol, Pazmany Peter setany 1-C, H-1117 Budapest, Hungary
Halassy, Melinda
APPLIED VEGETATION SCIENCE,
2023,
26
(04)
[3]
INTERIOR PLANTING - COSTS OF INSTALLATION AND MAINTENANCE
SCRIVENS, S
论文数:
0
引用数:
0
h-index:
0
SCRIVENS, S
ARCHITECTS JOURNAL,
1979,
169
(25):
: 1287
-
1290
[4]
Estimation of Water Pipe Installation Construction Costs
Chee, Ronson
论文数:
0
引用数:
0
h-index:
0
机构:
Riley Engn LLC, 9163 N Palm Brook Dr, Tucson, AZ 85743 USA
Riley Engn LLC, 9163 N Palm Brook Dr, Tucson, AZ 85743 USA
Chee, Ronson
Lansey, Kevin
论文数:
0
引用数:
0
h-index:
0
机构:
Univ Arizona, Dept Civil Engn & Engn Mech, Tucson, AZ 85721 USA
Riley Engn LLC, 9163 N Palm Brook Dr, Tucson, AZ 85743 USA
Lansey, Kevin
Chee, Erickson
论文数:
0
引用数:
0
h-index:
0
机构:
CheeNorthstar Construct LLC, 120 Navajo Dr Winslow, Winslow, AZ 86047 USA
Riley Engn LLC, 9163 N Palm Brook Dr, Tucson, AZ 85743 USA
Chee, Erickson
JOURNAL OF PIPELINE SYSTEMS ENGINEERING AND PRACTICE,
2018,
9
(03)
[5]
Predictive maintenance reduces downtimes and maintenance costs
不详
论文数:
0
引用数:
0
h-index:
0
不详
ZKG INTERNATIONAL,
2017,
70
(10):
: 14
-
14
[6]
New scrubber technology reduces installation costs
不详
论文数:
0
引用数:
0
h-index:
0
不详
POLLUTION ENGINEERING,
2000,
32
(02)
: 43
-
44
[7]
TRUSS DESIGN REDUCES SPRINKLER INSTALLATION COSTS
不详
论文数:
0
引用数:
0
h-index:
0
不详
DESIGN NEWS,
1977,
33
(18)
: 14
-
14
[8]
Longer HDPE pipe lengths cut installation costs
Gas Ind (Park Ridge IL),
8
(17):
[9]
NEW PIPE MAY CUT INSTALLATION COSTS.
Fisher, William
论文数:
0
引用数:
0
h-index:
0
Fisher, William
Water and Wastes Engineering,
1975,
12
(06):
[10]
Ceramic blanket reduces maintenance costs
1600,
(13):
←
1
2
3
4
5
→