Energy, economic and environmental performance assessment of a grid-tied rooftop system in different cities of India based on 3E analysis

被引:24
作者
Saxena, Anupama Khare [1 ]
Saxena, Seema [1 ]
Sudhakar, K. [2 ,3 ]
机构
[1] Rajiv Gandhi Proudyogiki Vishwavidyalaya RGPV, Dept Elect & Elect Engn, Bhopal 462036, India
[2] Maulana Azad Natl Inst Technol, Energy Ctr, Bhopal 462003, India
[3] Univ Malaysia Pahang, Fac Mech & Automot Engn Technol, Pekan Pahang 26600, Malaysia
来源
CLEAN ENERGY | 2021年 / 5卷 / 02期
关键词
technical analysis; solar photovoltaic system; plant feasibility; grid-connected system; performance parameters; PHOTOVOLTAIC POWER-PLANT; SOLAR PV SYSTEM; SIMULATION;
D O I
10.1093/ce/zkab008
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
India is very rich in solar energy, with a total of 3000 sunshine hours annually in most places. The installation of on-grid rooftop electricity-generation photovoltaic (PV) systems is currently undergoing substantial growth and extension as an alternate source of energy that contributes to Indian buildings. This paper analyses the viability of mounting solar PV plants in distinct cities of India in various locations with different climate conditions such as Delhi, Bhopal, Udaipur, Ahmadabad, Thiruvananthapuram, Pune and Madurai. The technical feasibility of installing a 100-kWp system is evaluated using PVsyst software under local climatic conditions. The performance ratio is between 70% and 80%, with a capacity utilization factor of 19-21% and estimated energy output of 170 MWh annually at all sites. The system produces 400-500 kWh of energy daily at a per-unit cost of INR 6-7 (Indian rupees) in all locations. The lifespan of the system is similar to 25-30 years, reducing about 150-170 tons of carbon-dioxide emission to the atmosphere every year. The payback period of the system is similar to 5-6 years, which defines its feasibility. This information would encourage organizations and individuals to install such PV plants on the rooftops of buildings to use solar electricity for meeting the energy demands of the country. [GRAPHICS] .
引用
收藏
页码:288 / 301
页数:14
相关论文
共 23 条
[1]   Performance Analysis of a Grid-Connected Rooftop Solar Photovoltaic System [J].
Akpolat, Alper Nabi ;
Dursun, Erkan ;
Kuzucuoglu, Ahmet Emin ;
Yang, Yongheng ;
Blaabjerg, Frede ;
Baba, Ahmet Fevzi .
ELECTRONICS, 2019, 8 (08)
[2]  
[Anonymous], SOL INV
[3]   Solar powered green campus: a simulation study [J].
Baitule, Akshay Suhas ;
Sudhakar, K. .
INTERNATIONAL JOURNAL OF LOW-CARBON TECHNOLOGIES, 2017, 12 (04) :400-410
[4]   Performance prediction of 60kW(p) PV power plant in an educational institute [J].
Bhattacharjee, Subhadeep ;
Nath, Anirudh ;
Bhowmik, Saurabh ;
Sinha, Mrinmoy ;
Nath, Monoj ;
Jamatia, Nandalal ;
Debbarma, Jyotish .
INTERNATIONAL JOURNAL OF AMBIENT ENERGY, 2013, 34 (03) :112-121
[5]  
Central electricity authority, 2019, ANN REP CEA
[6]   Techno-economic analysis of solar photovoltaic power plant for garment zone of Jaipur city [J].
Chandel, Mevin ;
Agrawal, G. D. ;
Mathur, Sanjay ;
Mathur, Anuj .
CASE STUDIES IN THERMAL ENGINEERING, 2014, 2 :1-7
[7]   Monitoring and performance analysis of grid connected photovoltaic under different climatic conditions in south Algeria [J].
Dabou, Rachid ;
Bouchafaa, Farid ;
Arab, Amar Hadj ;
Bouraiou, Ahmed ;
Draou, Mohammed Djamel ;
Necaibia, Ammar ;
Mostefaoui, Mohammed .
ENERGY CONVERSION AND MANAGEMENT, 2016, 130 :200-206
[8]   Performance simulation of grid-connected rooftop solar PV system for small households: A case study of Ujjain, India [J].
Dondariya, Chandrakant ;
Porwal, Deepak ;
Awasthi, Anshul ;
Shukla, Akash Kumar ;
Sudhakar, K. ;
Manohar, Murali S. R. ;
Bhimte, Amit .
ENERGY REPORTS, 2018, 4 :546-553
[9]  
Garg V, 2019, TECHNICAL REPORT
[10]   Analyzing the on-field performance of a 1-megawatt-grid-tied PV system in South India [J].
Goura, Rohith .
INTERNATIONAL JOURNAL OF SUSTAINABLE ENERGY, 2015, 34 (01) :1-9