共 56 条
[3]
Planning for Successful Transients and Trips in a 1MWe-Scale High-Temperature sCO2 Test Loop
[J].
JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME,
2019, 141 (06)
[4]
[Anonymous], 2010, ASME B31.1
[5]
[Anonymous], 2014, 4 INT S SUP CO2 POW
[6]
[Anonymous], 2012, SAND2012-9546
[7]
[Anonymous], 2007, NIST REFERENCE FLUID
[8]
Aritomi Masanori, 2011, Journal of Power and Energy Systems, V5, P45, DOI 10.1299/jpes.5.45
[10]
Preliminary assessment of sCO2 power cycles for application to CSP Solar Tower plants
[J].
8TH INTERNATIONAL CONFERENCE ON APPLIED ENERGY (ICAE2016),
2017, 105
:1116-1122