Simulation-based multiple project management in engineering design

被引:0
作者
Licht, T. [1 ]
Schmidt, L. [2 ]
Schlick, C. M. [1 ]
Dohmen, L. [3 ]
Luczak, H. [1 ]
机构
[1] Univ Aachen, Rhein Westfal TH Aachen, Inst Ind Engn & Ergonom, D-5100 Aachen, Germany
[2] Res Inst Commun, Informat Proc & Ergonom FKIE, Aachen, Germany
[3] GmbH, Bayer Business Services, Aachen, Germany
来源
FUTURE OF PRODUCT DEVELOPMENT | 2007年
关键词
multiple project management; simulation; bounded rational choice; product development;
D O I
10.1007/978-3-540-69820-3_53
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper a person-centered, actor-driven project simulation approach is presented that can cope with highly parallel tasks in multiple projects and can, therefore, help managers to plan concurrent product development projects. The task execution sequence is determined by means of a bounded rational choice model accounting for the urgency of tasks. The model creates realistic project dynamics using only a small number of input parameters. The project manager is, for instance, not forced to specify fixed predecessor-successor-relations of tasks. The model was validated with historical project data from a company of the German electronics industry. Using Student's t-tests the simulated project durations showed no significant derivation from the historical duration.
引用
收藏
页码:543 / +
页数:4
相关论文
共 31 条
[1]   FROM PROJECT TO PROCESS MANAGEMENT - AN EMPIRICALLY-BASED FRAMEWORK FOR ANALYZING PRODUCT DEVELOPMENT TIME [J].
ADLER, PS ;
MANDELBAUM, A ;
NGUYEN, V ;
SCHWERER, E .
MANAGEMENT SCIENCE, 1995, 41 (03) :458-484
[2]   A marketplace in the brain? [J].
Ainslie, G ;
Monterosso, J .
SCIENCE, 2004, 306 (5695) :421-423
[3]  
Andersson J, 1998, P 1998 DETC ASME DES
[4]   Modeling impacts of process architecture on cost and schedule risk in product development [J].
Browning, TR ;
Eppinger, SD .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2002, 49 (04) :428-442
[5]   A simulation-based process model for managing complex design projects [J].
Cho, SH ;
Eppinger, SD .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2005, 52 (03) :316-328
[6]  
CHRISTIANSEN T, 1993, THESIS STANFORD U PA
[7]  
COHEN G, 1992, THESIS STANFORD U PA
[8]   Generalised models of design iteration using signal flow graphs [J].
Eppinger, SD ;
Nukala, MV ;
Whitney, DE .
RESEARCH IN ENGINEERING DESIGN-THEORY APPLICATIONS AND CONCURRENT ENGINEERING, 1997, 9 (02) :112-123
[9]   Overcoming the 90% syndrome: Iteration management in concurrent development projects [J].
Ford, DN ;
Sterman, JD .
CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 2003, 11 (03) :177-186
[10]   Modeling design development in unpredictable environments [J].
Gil, N ;
Tommelein, ID ;
Kirkendall, R .
WSC'01: PROCEEDINGS OF THE 2001 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2001, :515-522