Long-term resource planning in the high-tech industry: Capacity or inventory?

被引:10
作者
Smirnov, Dina [1 ]
van Jaarsveld, Willem [1 ]
Atan, Zumbul [1 ]
de Kok, Ton [1 ]
机构
[1] Eindhoven Univ Technol, Sch Ind Engn, POB 513, NL-5600 MB Eindhoven, Netherlands
关键词
Capacity expansion; High-tech industry; Multi-echelon assembly system; Stochastic programming; Deterministic equivalent; Scenario-based approach; DEMAND; OPTIMIZATION; MANAGEMENT; MODELS;
D O I
10.1016/j.ejor.2020.12.062
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Volatile and non-stationary demand, very complex production processes, long production and capacity acquisition leadtimes, and extremely high and rarely reversible capacity acquisition costs make capacity planning in the high-tech industry a particularly challenging managerial task. To cope with demand surges and hedge against its uncertainty, firms can invest in order to expand their capacity for the longterm. For the short-term, however, demand is often fixed due to committed orders, and excess capacity might be available that may be used to build up inventory as a complementary means of hedging against these demand surges and uncertainty. In multi-echelon systems, these decisions need to be made simultaneously and must be aligned over the echelons. We address the strategic problem of determining the optimal inventory buildup and capacity expansion timing and amount across locations of a multi-echelon supply chain, as well as the operational problem of production planning. We model the problem as a two-stage stochastic program (SP), with strategic decisions at the first stage and operational decisions at the second stage. We enumerate the capacity expansion timing and use the deterministic equivalent formulation to optimize the other strategic decisions. Through an extensive numerical study, we provide practical managerial insights into the system behavior. (C) 2021 The Author(s). Published by Elsevier B.V.
引用
收藏
页码:926 / 940
页数:15
相关论文
共 36 条
[1]   Simultaneous capacity and production management of short-life-cycle, produce-to-stock goods under stochastic demand [J].
Angelus, A ;
Porteus, EL .
MANAGEMENT SCIENCE, 2002, 48 (03) :399-413
[2]   Robust capacity planning in semiconductor manufacturing [J].
Barahona, F ;
Bermon, S ;
Günlük, O ;
Hood, S .
NAVAL RESEARCH LOGISTICS, 2005, 52 (05) :459-468
[3]  
Bihlmaier R., 2009, SUPPLY CHAIN PLAN QU, P367, DOI [10.1007/978-3-540-93775-3_14, DOI 10.1007/978-3-540-93775-3_14]
[4]   Managing capacity and inventory jointly in manufacturing systems [J].
Bradley, JR ;
Glynn, PW .
MANAGEMENT SCIENCE, 2002, 48 (02) :273-288
[5]   Tool capacity planning in semiconductor manufacturing [J].
Çatay, B ;
Erengüç, SS ;
Vakharia, AJ .
COMPUTERS & OPERATIONS RESEARCH, 2003, 30 (09) :1349-1366
[6]   Coordinated capacity planning in two-stage thin-film-transistor liquid-crystal-display (TFT-LCD) production networks [J].
Chen, Tzu-Li ;
Lin, James T. ;
Wu, Cheng-Hung .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2014, 42 (01) :141-156
[7]   Stochastic multi-site capacity planning of TFT-LCD manufacturing using expected shadow-price based decomposition [J].
Chen, Tzu-Li ;
Lu, Hao-Chun .
APPLIED MATHEMATICAL MODELLING, 2012, 36 (12) :5901-5919
[8]   A multiobjective metaheuristic for a mean-risk multistage capacity investment problem with process flexibility [J].
Claro, Joao ;
de Sousa, Jorge Pinho .
COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (04) :838-849
[9]  
de Kok TG, 2003, HDBK OPER R, V11, P597
[10]  
de Kruijff J. T, 2019, THESIS TU EINDHOVEN