Optimizing con fi guration and scheduling of double 40 ft dual-trolley quay cranes and AGVs for improving container terminal services

被引:56
作者
Yue, Lijun [1 ]
Fan, Houming [1 ]
Ma, Mengzhi [1 ]
机构
[1] Dalian Maritime Univ, Dept Transportat Engn, Dalian 116026, Peoples R China
基金
中国国家自然科学基金;
关键词
Customer satisfaction; Handling equipment; Automated container terminal; Configuration; Scheduling; AUTOMATED GUIDED VEHICLES; ASSIGNMENT; OPTIMIZATION; OPERATIONS; TRUCK; TRANSPORTATION; CONFIGURATION; MANAGEMENT; MODEL; PORT;
D O I
10.1016/j.jclepro.2021.126019
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Meeting the individual needs of customers will increase the competitiveness of container terminals. This paper optimizes the configuration and scheduling of double 40 ft dual-trolley quay cranes (QCs) and automated guided vehicles (AGVs) to improve the service of a container terminal. A two-stage biobjective mixed integer programming model with the objectives of maximizing customer satisfaction, minimizing the ineffective time of AGVs, and minimizing the delay time of QCs is proposed. For the proposed model, the piecewise function in the first stage is linearized by adding constraints of special ordered sets, and the GUROBI software is used to solve it. Then, an improved nondominated sorting genetic algorithm-III is applied that aims to efficiently solve the second-stage model. Numerical experiments are presented to verify the effectiveness of models and algorithms. The results demonstrate the rationality and validity of the method, which selects the configuration and scheduling scheme based on customer satisfaction. ? 2021 Elsevier Ltd. All rights reserved.
引用
收藏
页数:15
相关论文
共 56 条
[1]   The quay crane scheduling problem with non-crossing and safety clearance constraints: An exact solution approach [J].
Abou Kasm, Omar ;
Diabat, Ali .
COMPUTERS & OPERATIONS RESEARCH, 2019, 107 :189-199
[2]   A Lagrangian relaxation-based heuristic for the multi-ship quay crane scheduling problem with ship stability constraints [J].
Al-Dhaheri, Noura ;
Diabat, Ali .
ANNALS OF OPERATIONS RESEARCH, 2017, 248 (1-2) :1-24
[3]   The quay crane scheduling problem with nonzero crane repositioning time and vessel stability constraints [J].
Al-Dhaheri, Noura ;
Jebali, Aida ;
Diabat, Ali .
COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 94 :230-244
[4]   Combined quay crane assignment and quay crane scheduling with crane inter-vessel movement and non-interference constraints [J].
Alsoufi, Ghazwan ;
Yang, Xinan ;
Salhi, Abdellah .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2018, 69 (03) :372-383
[5]  
[Anonymous], 1970, OR
[6]   Internet of Ships: A Survey on Architectures, Emerging Applications, and Challenges [J].
Aslam, Sheraz ;
Michaelides, Michalis P. ;
Herodotou, Herodotos .
IEEE INTERNET OF THINGS JOURNAL, 2020, 7 (10) :9714-9727
[7]   Comparison of operations of AGVs and ALVs in an automated container terminal [J].
Bae, Hyo Young ;
Choe, Ri ;
Park, Taejin ;
Ryu, Kwang Ryel .
JOURNAL OF INTELLIGENT MANUFACTURING, 2011, 22 (03) :413-426
[8]   GLOBAL OPTIMIZATION USING SPECIAL ORDERED SETS [J].
BEALE, EML ;
FORREST, JJH .
MATHEMATICAL PROGRAMMING, 1976, 10 (01) :52-69
[9]   Sustainable supply chain management in the digitalisation era: The impact of Automated Guided Vehicles [J].
Bechtsis, Dimitrios ;
Tsolakis, Naoum ;
Vlachos, Dimitrios ;
Iakovou, Eleftherios .
JOURNAL OF CLEANER PRODUCTION, 2017, 142 :3970-3984
[10]   A fast heuristic for quay crane scheduling with interference constraints [J].
Bierwirth, Christian ;
Meisel, Frank .
JOURNAL OF SCHEDULING, 2009, 12 (04) :345-360