Scheduling extra freight trains on railway networks

被引:156
作者
Cacchiani, Valentina [1 ]
Caprara, Alberto [1 ]
Toth, Paolo [1 ]
机构
[1] Univ Bologna, DEIS, I-40136 Bologna, Italy
关键词
Train timetabling; Freight transportation; Railway network; Alternative paths; Lagrangian relaxation; Heuristic algorithm; GENERATION; TIMETABLES; TIME;
D O I
10.1016/j.trb.2009.07.007
中图分类号
F [经济];
学科分类号
02 ;
摘要
We study the problem of freight transportation in railway networks. where both passenger and freight trains are run. While the passenger trains have a prescribed timetable that cannot be changed. freight train operators send the infrastructure manager requests to insert new freight trains. For each freight train, the associated train operator specifies a preferred ideal timetable, which can be modified by the infrastructure manager in order to respect safeness operational constraints. in particular, this modification may correspond to routing the train along a path which is different with respect to the one in the ideal timetable. Roughly speaking, the objective is to introduce as many new freight trains as possible by assigning them timetables that are as close as possible to the ideal ones. For this timetabling problem on a generic railway network, we present an integer linear programming formulation. that generalizes some formulations already presented for the case of a single railway line, and a Lagrangian heuristic based oil this formulation Computational results on real-world instances are reported. (C) 2009 Elsevier Ltd. All rights reserved.
引用
收藏
页码:215 / 231
页数:17
相关论文
共 22 条
[1]  
BORNDORFER R, 2007, ATMOS 2007 7 WORKSH
[2]  
BRUGLIERI M, 2000, RICERCA OPERATIVA, V30, P3
[3]  
BURKOLTER DM, 2005, ADV OR AI METHODS TR, P290
[4]   A column generation approach to train timetabling on a corridor [J].
Cacchiani, Valentina ;
Caprara, Alberto ;
Toth, Paolo .
4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2008, 6 (02) :125-142
[5]   A Lagrangian heuristic algorithm for a real-world train timetabling problem [J].
Caprara, A ;
Monaci, M ;
Toth, P ;
Guida, PL .
DISCRETE APPLIED MATHEMATICS, 2006, 154 (05) :738-753
[6]   Modeling and solving the train timetabling problem [J].
Caprara, A ;
Fischetti, M ;
Toth, P .
OPERATIONS RESEARCH, 2002, 50 (05) :851-861
[7]  
Caprara A, 2007, HBK OPERAT RES MANAG, V14, P129, DOI 10.1016/S0927-0507(06)14003-7
[8]  
Desrosiers J., 1995, Handbooks Oper. Res. Management Sci., V8, P35
[9]  
EROL B, 2008, COMPUTERS RAILWAYS, V11
[10]  
Escudero L. F., 1994, Annals of Operations Research, V50, P219, DOI 10.1007/BF02085641