摘要
This study develops hybrid modeling and algorithmic frameworks for analyzing the mutual effects of multiple sources of uncertainty on the quality and the robustness of construction schedules. To cope with multiple sources of disruptions, i.e., random resource failures and severe weather conditions, this paper develops a simulation-optimization model that aims to generate delay resistant project schedules. The Variable Neighborhood Search (VNS) is hybridized with an event-driven simulation framework to generate efficient and robust solutions for computationally expensive resource-constrained project scheduling problems (RCPSP). The simulation experiments have been carried out by a flexible modeling framework that can be adopted by project experts to design construction schedules subject to the uncertainty associated with the multiple resource failure. The problem is mathematically formulated as a bi-objective optimization model aiming to minimize the project makespan and maximize a novel surrogate robustness function simultaneously. The computational results of the proposed VNS method have been compared with those obtained from the commercial optimization solvers. The simulation-optimization model's application is demonstrated through a case study of the hydropower plant construction project with multiple renewable and non-renewable resources. Based on an extensive statistical analysis of real-life scenarios, this study contributes to a trade-off analysis of project makespan and robustness in construction projects. The t-test statistical analysis results indicate the significance of the project's average delay reduction by implementing the robust project schedule. The outcomes confirm that the designed framework can generate a more efficient project schedule with a higher rate of protection compared with the existing robust approaches.
引用
收藏
页码:1515 / 1532
页数:18
相关论文
共 18 条
  • [1] Dynamic Optimization for Analyzing Effects of Multiple Resource Failures on Project Schedule Robustness
    Ramin Ansari
    KSCE Journal of Civil Engineering, 2021, 25 : 1515 - 1532
  • [2] Optimization for limited resource schedule in public construction project
    Li, Hanwen
    Luo, Fuzhou
    FRONTIERS OF MECHANICAL ENGINEERING AND MATERIALS ENGINEERING II, PTS 1 AND 2, 2014, 457-458 : 1639 - 1643
  • [3] Project scheduling cost optimization based on resource transfer costs and robustness
    Zhang, Houkun
    Ma, Ran
    He, Zhengwen
    COMPUTERS & OPERATIONS RESEARCH, 2024, 161
  • [4] Time Performance Optimization and Resource Conflicts Resolution for Multiple Project Management
    Liu, Cong
    Cheng, Jiujun
    Wang, Yirui
    Gao, Shangce
    IEICE TRANSACTIONS ON INFORMATION AND SYSTEMS, 2016, E99D (03): : 650 - 660
  • [5] Adaptive particle swarm optimization for the project scheduling problem with dynamic allocation of resource
    Xu, Jin
    Fei, Shao-Mei
    Zhang, Shu-You
    Shi, Yue-Ding
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2011, 17 (08): : 1790 - 1797
  • [6] Dynamic Optimization of the Multi-Skilled Resource-Constrained Project Scheduling Problem with Uncertainty in Resource Availability
    Wang, Min
    Liu, Guoshan
    Lin, Xinyu
    MATHEMATICS, 2022, 10 (17)
  • [7] Dynamic optimization of project delivery using integrated macro-micro resource metrics
    Nott, Dale
    Proceedings of 20th IPMA World Congress on Project Management, Vols 1 and 2, 2006, : 606 - 609
  • [8] Optimization of bi-objective resource-constrained project schedules with multiple modes and smoothing resource usage
    Okada, Ikutaro
    Tasan, Seren Ozmehmet
    Gen, Mitsuo
    PROCEEDING OF THE SEVENTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2008, 7 : 588 - 595
  • [9] Test Schedule Optimization for Multicore SoCs: Handling Dynamic Voltage Scaling and Multiple Voltage Islands
    Kavousianos, Xrysovalantis
    Chakrabarty, Krishnendu
    Jain, Arvind
    Parekhji, Rubin
    IEEE TRANSACTIONS ON COMPUTER-AIDED DESIGN OF INTEGRATED CIRCUITS AND SYSTEMS, 2012, 31 (11) : 1754 - 1766
  • [10] A Multi-objective Dynamic Optimization Approach to Project Schedule Management: A Case Study of a Gas Field Construction
    Ramin Ansari
    Mohammad Khalilzadeh
    M. Reza Hosseini
    KSCE Journal of Civil Engineering, 2022, 26 : 1005 - 1013