Research on Early Warning and Risk Control Technology in Karst Tunnel Construction

被引:0
作者
Liu, Qin [1 ]
Li, Shucai [1 ]
Zhang, Ning [1 ]
Xue, Yiguo [1 ]
Yang, Lei [1 ]
Zhang, Xiao [1 ]
Liu, Rentai [1 ]
机构
[1] Shandong Univ, Geotech & Struct Engn Res Ctr, Jinan 250061, Peoples R China
来源
PROCEEDINGS OF 2009 INTERNATIONAL SYMPOSIUM ON RISK CONTROL AND MANAGEMENT OF DESIGN, CONSTRUCTION AND OPERATION IN UNDERGROUND ENGINEERING | 2009年
关键词
karst tunnel; risk control; early warning; geological forecast; monitoring measurement;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the construction of mountain tunnel in karst area, there are some disasters, such as collapse, gushing water and so on. In order to avoid casualties and heavy economical losses caused by disaster accidents, construction risk must be warned early and controlled. Common methods used in risk warning and control are introduced with their principles analyzed. Illustrated by the case of Hurongxi Longtan tunnel, TSP 203 system is used to perform the advanced detection in the tunnel before excavation. Water-bearing condition is detected by using infrared water detection apparatus and the peripheral displacement of the tunnel is monitored real-timely in excavation process. Combining the several methods, collapse of the tunnel is predicted successfully. The result indicates that the technology is worth popularizing in similar engineering.
引用
收藏
页码:253 / 256
页数:4
相关论文
共 50 条
  • [21] Research on construction engineering safety early warning based on BP neural network
    Liu L.
    Wang X.
    Zhang C.
    Li X.
    International Journal of Wireless and Mobile Computing, 2022, 22 (3-4) : 281 - 289
  • [22] The Construction of the Local Financial Risk Early Warning System Based on Empirical Analysis
    Nu Er Bi Ya Ai He Mai Ti
    Zhu Hua
    Mai Mai Ti Jiang Tu Er Xun
    PROCEEDINGS OF 2013 INTERNATIONAL CONFERENCE ON PUBLIC ADMINISTRATION (9TH), VOL II, 2013, : 793 - 798
  • [23] Outlier detection of tender evaluation for construction projects: an early risk warning system
    Cheng, Tiexin
    Wang, Yiwang
    Guo, Tao
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON RISK MANAGEMENT & GLOBAL E-BUSINESS, VOLS I AND II, 2009, : 1191 - 1196
  • [24] Construction of corruption early warning mechanism
    Guo, Qiujun
    Zheng, Youde
    ADVANCED RESEARCH ON INDUSTRY, INFORMATION SYSTEMS AND MATERIAL ENGINEERING, PTS 1-7, 2011, 204-210 : 691 - 694
  • [25] Construction of the Early-warning Index System for the Risk of the International Logistics Operation
    Zhang, Guohua
    Yuan, Jiali
    2ND IEEE INTERNATIONAL CONFERENCE ON ADVANCED COMPUTER CONTROL (ICACC 2010), VOL. 5, 2010, : 209 - 213
  • [26] On the construction of an early-warning system for systematic risk in China's banking
    Tang Lingxiao
    Fan Xiaofeng
    MODERN FINANCE AND GLOBAL TRADING COOPERATION: PROCEEDINGS OF THE 5TH INTERNATIONAL ANNUAL CONFERENCE ON WTO AND FINANCIAL ENGINEERING, 2008, : 33 - 39
  • [27] Research on Real Estate Market Risk and Early Warning of Guangzhou City
    Jia, S.
    Wang, X.
    CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1076 - 1082
  • [28] RESEARCH AND APPLICATION OF SNOWBELT FLOOD RISK EARLY-WARNING TECHNOLOGY - A CASE STUDY IN ILI STATE, XINJIANG PROVINCE
    Wen, Qi
    Nie, Juan
    Li, Lingling
    Liu, Liang
    Zhang, Baojun
    2012 IEEE INTERNATIONAL GEOSCIENCE AND REMOTE SENSING SYMPOSIUM (IGARSS), 2012, : 879 - 882
  • [29] Research on Early Warning Paradigm for Crowd Stampeding Risk in Public Places
    Zhu Hong
    Zhu Zhenjiang
    Liu Shangnan
    Zhang Hao
    PROCEEDINGS OF THE 13TH INTERNATIONAL CONFERENCE ON INNOVATION AND MANAGEMENT, VOLS I & II, 2016, : 1059 - 1063
  • [30] Early Warning of the Construction Safety Risk of a Subway Station Based on the LSSVM Optimized by QPSO
    Zhang, Leian
    Wang, Junwu
    Wu, Han
    Wu, Mengwei
    Guo, Jingyi
    Wang, Shengmin
    APPLIED SCIENCES-BASEL, 2022, 12 (11):