共 50 条
- [1] A GENETIC ALGORITHM FOR THE UNRELATED PARALLEL MACHINE SCHEDULING PROBLEM WITH JOB SPLITTING AND SEQUENCE-DEPENDENT SETUP TIMES - LOOM SCHEDULING TEKSTIL VE KONFEKSIYON, 2014, 24 (01): : 66 - 73
- [6] Parallel Machine Scheduling with Resources Constraint and Sequence Dependent Setup Times PROCEEDINGS OF 2012 3RD INTERNATIONAL ASIA CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION (IEMI2012), 2013, : 801 - 811