Mud pumping in the roadbed of ballastless high-speed railway

被引:28
作者
Bian, Xuecheng [1 ,2 ]
Wan, Zhangbo [1 ,2 ]
Zhao, Chuang [2 ]
Cui, Yujun [3 ]
Chen, Yunmin [1 ,2 ]
机构
[1] Zhejiang Univ, Dept Civil Engn, Key Lab Soft Soils & Geoenvironm Engn, MOE, Hangzhou, Peoples R China
[2] Zhejiang Univ, Ctr Hypergrav Expt & Interdisciplinary Res, Hangzhou, Peoples R China
[3] Ecole Ponts ParisTech ENPC, Navier CERMES, Champs Sur Marne, France
来源
GEOTECHNIQUE | 2022年 / 73卷 / 07期
基金
中国国家自然科学基金;
关键词
erosion; railway tracks; repeated loading; vibration; water supply; INTERNAL STABILITY; TRACK; SOILS; REINFORCEMENT; SUBSTRUCTURE; PERFORMANCE; STIFFNESS; SUFFUSION; SUBGRADE; BEHAVIOR;
D O I
10.1680/jgeot.21.00135
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Mud pumping that is deliberately avoided in the design of a ballastless high-speed railway still occurs and induces extraordinary track vibrations. In this study, in situ investigations and laboratory tests were performed to disclose the initiation and development of mud pumping detected in the field. The in situ investigations indicated that mud pumping principally appeared at both ends of the concrete base up to a maximum distance of 2 m. Precipitation, instead of groundwater, was found to be the water source triggering mud pumping; this infiltrated the graded gravel roadbed through the detachments of the ends of the overlying concrete bases due to the whipping effect. Once mud pumping occurred, the vibrations of concrete bases were aggravated and caused severe track settlements under train loads. The results of laboratory tests indicated that the infiltrated rainwater was retained in the roadbed above the less permeable subgrade, and the roadbed contained an unstable particle skeleton with excessive plastic fine particles, both of which provided favourable conditions to form mud pumping under dense high-speed train loads. Soil particles of less than 7 center dot 1 mm in diameter migrated during mud pumping; these first accumulated at the lower roadbed, then gradually migrated to the upper roadbed, actuated by the hydraulic gradient generated, and were finally pumped out through the detachments around the expansion gaps, thereby resulting in large amounts of voids in the roadbed and a vicious cycle if not treated in a timely fashion. These features of mud pumping in ballastless tracks differ from those of ballasted tracks and will benefit the development of remediation measures and improvement of slab track designs.
引用
收藏
页码:614 / 628
页数:15
相关论文
共 50 条
[1]  
ASTM, 2011, D158699 ASTM
[2]  
ASTM, 2011, ASTM D2487 00 STANDA
[3]  
Aw E.S., 2007, THESIS MIT
[4]   GEOTEXTILES OR GEOMEMBRANES IN TRACK - BRITISH RAILWAYS EXPERIENCE [J].
AYRES, DJ .
GEOTEXTILES AND GEOMEMBRANES, 1986, 3 (2-3) :129-142
[5]   Track settlement restoration of ballastless high-speed railway using polyurethane grouting: Full-scale model testing [J].
Bian, Xuecheng ;
Duan, Xiang ;
Li, Wei ;
Jiang, Jianqun .
TRANSPORTATION GEOTECHNICS, 2021, 26
[6]  
Boomintahan S., 1988, Indian Geotechnical Journal, V18, P31
[7]   Investigation of railway track subgrade. Part 2: Case study [J].
Brough, MJ ;
Ghataora, G ;
Stirling, AB ;
Madelin, KB ;
Rogers, CDF ;
Chapman, DN .
PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-TRANSPORT, 2006, 159 (02) :83-92
[8]  
Burmister D.M., 1950, P 29 ANN M HIGHW RES, V29, P402
[9]  
Cai Xiaopei., 2015, Sensors and Transducers, V186, P154
[10]   Reinforcement and mud-pumping benefits of geosynthetics in railway tracks: Model tests [J].
Chawla, Sowmiya ;
Shahu, J. T. .
GEOTEXTILES AND GEOMEMBRANES, 2016, 44 (03) :366-380