Early warning model for slope debris flow initiation

被引:9
作者
Li, Ming-li [1 ,2 ]
Jiang, Yuan-jun [1 ]
Yang, Tao [3 ]
Huang, Qiang-bing [4 ]
Qiao, Jian-ping [1 ]
Yang, Zong-ji [1 ]
机构
[1] Chinese Acad Sci, Inst Mt Hazards & Environm, Key Lab Mt Hazards & Earth Surface Proc, Chengdu 610041, Sichuan, Peoples R China
[2] Univ Chinese Acad Sci, Beijing 100049, Peoples R China
[3] Sichuan Bur Geol & Mineral Resources, Chengdu Ctr Hydrogeol & Engn Geol, Chengdu 610000, Sichuan, Peoples R China
[4] Changan Univ, Dept Geol Engn, Xian 710054, Shaanxi, Peoples R China
基金
中国国家自然科学基金;
关键词
Slope debris flow; Artificial rainfall model; Early warning model; Model experiment; SHALLOW LANDSLIDES; WENCHUAN EARTHQUAKE; RAINFALL THRESHOLDS; INTENSITY;
D O I
10.1007/s11629-017-4779-z
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Early warning model of debris flow is important for providing local residents with reliable and accurate warning information to escape from debris flow hazards. This research studied the debris flow initiation in the Yindongzi gully in Dujiangyan City, Sichuan province, China with scaled-down model experiments. We set rainfall intensity and slope angle as dominating parameters and carried out 20 scaled-down model tests under artificial rainfall conditions. The experiments set four slope angles (32A degrees, 34A degrees, 37A degrees, 42A degrees) and five rainfall intensities (60 mm/h, 90 mm/h, 120 mm/h, 150 mm/h, and 180 mm/h) treatments. The characteristic variables in the experiments, such as, rainfall duration, pore water pressure, moisture content, surface inclination, and volume were monitored. The experimental results revealed the failure mode of loose slope material and the process of slope debris flow initiation, as well as the relationship between the surface deformation and the physical parameters of experimental model. A traditional rainfall intensity-duration early warning model (I-D model) was firstly established by using a mathematical regression analysis, and it was then improved into ISD model and ISM model (Here, I is rainfall Intensity, S is Slope angle, D is rainfall Duration, and M is Moisture content). The warning model can provide reliable early warning of slope debris flow initiation.
引用
收藏
页码:1342 / 1353
页数:12
相关论文
共 22 条
  • [1] [Anonymous], J SOIL EROSION SOIL
  • [2] Early warning of rainfall-induced shallow landslides and debris flows in the USA
    Baum, Rex L.
    Godt, Jonathan W.
    [J]. LANDSLIDES, 2010, 7 (03) : 259 - 272
  • [3] Probabilistic rainfall thresholds for landslide occurrence using a Bayesian approach
    Berti, M.
    Martina, M. L. V.
    Franceschini, S.
    Pignone, S.
    Simoni, A.
    Pizziolo, M.
    [J]. JOURNAL OF GEOPHYSICAL RESEARCH-EARTH SURFACE, 2012, 117
  • [4] THE RAINFALL INTENSITY - DURATION CONTROL OF SHALLOW LANDSLIDES AND DEBRIS FLOWS
    CAINE, N
    [J]. GEOGRAFISKA ANNALER SERIES A-PHYSICAL GEOGRAPHY, 1980, 62 (1-2) : 23 - 27
  • [5] Chen G, 2017, RESPONSE LOESS LANDS, P1, DOI [10.1007/s10346-017-0924-6, DOI 10.1007/S10346-017-0924-6]
  • [6] [陈晓清 Chen Xiaoqing], 2006, [岩石力学与工程学报, Chinese Journal of Rock Mechanics and Engineering], V25, P106
  • [7] Destruction of vegetation due to geo-hazards and its environmental impacts in the Wenchuan earthquake areas
    Cui, Peng
    Lin, Yong-ming
    Chen, Can
    [J]. ECOLOGICAL ENGINEERING, 2012, 44 : 61 - 69
  • [8] Deangeli Chiara, 2009, American Journal of Environmental Sciences, V5, P487, DOI 10.3844/ajessp.2009.487.493
  • [9] [高冰 Gao Bing], 2011, [岩石力学与工程学报, Chinese Journal of Rock Mechanics and Engineering], V30, P2567
  • [10] [胡明鉴 Hu Mingjian], 2003, [岩石力学与工程学报, Chinese Journal of Rock Mechanics and Engineering], V22, P824