Charging-rate-based Battery Energy Storage System in Wind Farm and Battery Storage Cooperation Bidding Problem

被引:11
作者
Qiu, Zihang [1 ]
Zhang, Wang [1 ]
Lu, Shuai [2 ]
Li, Chaojie [1 ]
Wang, Jingbo [3 ]
Meng, Ke [1 ]
Dong, Zhaoyang [4 ]
机构
[1] UNSW, Sch Elect Engn & Telecommun, Sydney, NSW 2032, Australia
[2] Southeast Univ, Sch Elect Engn, Nanjing 210096, Peoples R China
[3] Nanjing Univ Sci & Technol, Sch Automat, Nanjing 210000, Peoples R China
[4] UNSW Digital Grid Futures Inst, Sydney, NSW 1466, Australia
关键词
Bidding; C-rate based battery energy storage system model; wind farm estimation error compensation; OPTIMIZATION; MANAGEMENT; LIFE;
D O I
10.17775/CSEEJPES.2021.00230
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Wind power has been proven to have the ability to participate in the frequency modulation (FM) market. Using batteries to improve wind power stability can better aid wind farms participating in the FM market. Battery energy storage system (BESS) has a promising future in applying regulation and load management in the power grid. For regulation services, normally, the regulation power prediction is estimated based on the required maximum regulation capacity; the power needed for the specific regulation service is unknown to the BESS owner. However, this information is needed in the regulation model when formulating the linearised BESS model with a constraint on the state of charge (SoC). This compromises the accuracy of the model greatly when it is applied for regulation service. Moreover, different control strategies can be employed by BESS. However, the current depth of discharge (DoD) based models have difficulties in being used in a linearization problem. Due to the consideration of the control strategy, the model becomes highly nonlinear and cannot be solved. In this paper, a charging rate (C-rate) based model is introduced, which can consider different control strategies of a BESS for cooperation with wind farms to participate in wind farm estimation error compensation, load management, energy bid, and regulation bid. First, the limitation of conventional BESS models are listed, and a new C-rate-based model is introduced. Then the C-rate-based BESS model is adopted in a wind farm and BESS cooperation scheme. Finally, experimental studies are carried out, and the DoD model and C-rate model optimization results are compared to prove the rationality of the C-rate model.
引用
收藏
页码:659 / 668
页数:10
相关论文
共 26 条
[1]  
[Anonymous], TESLA AUSTR POWERPAC
[2]  
[Anonymous], lithium- ion-batteries-work
[3]  
[Anonymous], learn/article/whatisthecrate
[4]   Short-Term Scheduling of Thermal Generators and Battery Storage With Depth of Discharge-Based Cost Model [J].
Duggal, Inderjeet ;
Venkatesh, Bala .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2015, 30 (04) :2110-2118
[5]  
Ela E, 2015, NRELCP5D0062815
[6]   Lithium-ion battery aging mechanisms and life model under different charging stresses [J].
Gao, Yang ;
Jiang, Jiuchun ;
Zhang, Caiping ;
Zhang, Weige ;
Ma, Zeyu ;
Jiang, Yan .
JOURNAL OF POWER SOURCES, 2017, 356 :103-114
[7]   Cooperation of Wind Power and Battery Storage to Provide Frequency Regulation in Power Markets [J].
He, Guannan ;
Chen, Qixin ;
Kang, Chongqing ;
Xia, Qing ;
Poolla, Kameshwar .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2017, 32 (05) :3559-3568
[8]   Optimal Bidding Strategy of Battery Storage in Power Markets Considering Performance-Based Regulation and Battery Cycle Life [J].
He, Guannan ;
Chen, Qixin ;
Kang, Chongqing ;
Pinson, Pierre ;
Xia, Qing .
IEEE TRANSACTIONS ON SMART GRID, 2016, 7 (05) :2359-2367
[9]   Long-Term Scheduling of Battery Storage Systems in Energy and Regulation Markets Considering Battery's Lifespan [J].
Kazemi, Mostafa ;
Zareipour, Hamidreza .
IEEE TRANSACTIONS ON SMART GRID, 2018, 9 (06) :6840-6849
[10]   A Hybrid Battery Model Capable of Capturing Dynamic Circuit Characteristics and Nonlinear Capacity Effects [J].
Kim, Taesic ;
Qiao, Wei .
IEEE TRANSACTIONS ON ENERGY CONVERSION, 2011, 26 (04) :1172-1180