Causes, Effects, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman

被引:136
作者
Alnuaimi, Ali S. [1 ]
Taha, Ramzi A. [1 ]
Al Mohsin, Mohammed [2 ]
Al-Harthi, Ali S. [3 ]
机构
[1] Sultan Qaboos Univ, Muscat, Oman
[2] Higher Coll Technol, Muscat, Oman
[3] Daleel Petr, Muscat, Oman
关键词
Construction management; Change order; Delay; Project completion; Cost overrun; Oman;
D O I
10.1061/(ASCE)CO.1943-7862.0000154
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Change orders are usually issued to cover variations in scope of work, material quantities, design errors, and unit rate changes. This paper discusses variations in public construction projects in Oman by investigating causes of variations, studying their effects on the project, identifying the beneficial parties, and suggesting remedies to alleviate related problems. Tasks included an analysis of four actual case studies and conducting a field survey via a questionnaire. It was determined that the client's additional works and modifications to design were the most important factors causing change orders, followed by the nonavailability of construction manuals and procedures. The most important effects of change orders on the project were found to be the schedule delays, disputes, and cost overruns. The contractor was found to be the party most benefiting from the change orders followed by the consultant and then the client. A set of remedial actions were suggested and respondents viewed that the revision of registration of consulting offices would be the most important action followed by establishing standard documents for design procedures and building a national database about soil conditions and services.
引用
收藏
页码:615 / 622
页数:8
相关论文
共 20 条
  • [1] Conflicting factors in construction projects: Korean perspective
    Acharya, Nirmal
    Lee, Young
    Im, Hae
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2006, 13 (06) : 543 - +
  • [2] Methodology for determining price variation in project execution
    Akpan, EOP
    Igwe, O
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (05): : 367 - 373
  • [3] Al-Momani A.H., 2000, INT J PROJ MANAG, V18, P51
  • [4] Arun C., 2007, J I ENG, V88, P27
  • [5] Causes of delay in large construction projects
    Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Box # 680, Dhahran, 31261, Saudi Arabia
    [J]. Int. J. Proj. Manage., 2006, 4 (349-357): : 349 - 357
  • [6] Chan D. W. M., 1997, International Journal of Project Management, V15, P55, DOI 10.1016/S0263-7863(96)00039-7
  • [7] Hybrid ANN-CBR model for disputed change orders in construction projects
    Chen, Jieh-Haur
    Hsu, S. C.
    [J]. AUTOMATION IN CONSTRUCTION, 2007, 17 (01) : 56 - 64
  • [8] Goudreau H., 2001, 5 KEY ELEMENTS CONST
  • [9] Quantitative definition of projects impacted by change orders
    Hanna, AS
    Camlic, R
    Peterson, PA
    Nordheim, EV
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2002, 128 (01): : 57 - 64
  • [10] Quantitative impacts of project change: Size issues
    Ibbs, CW
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1997, 123 (03): : 308 - 311