Predicting excavation methods and rock support: a case study from the Himalayan region of India

被引:8
作者
Chandra, Sharad [1 ]
Nilsen, Bjorn [1 ]
Lu, Ming [2 ]
机构
[1] NTNU, Dept Geol & Mineral Resources Engn, N-7491 Trondheim, Norway
[2] SINTEF, Bldg & Infrastructure, N-7034 Trondheim, Norway
关键词
Headrace tunnels; Himalayas; NTH time and cost prognosis; Q-method; Numerical modeling; Displacements;
D O I
10.1007/s10064-009-0252-8
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The Tapovan Vishnugad hydropower project (4 x 130 MW) in the Himalayan region of India, has been used as a case study to compare the problems and cost-effectiveness of a TBM or drill and blast excavation of the headrace tunnel and to assess the rock support measures for the powerhouse cavern. The NTH time and cost prognosis model indicated that the TBM would give a better weekly advance rate and unit excavation cost for the headrace tunnel. The Phase 2 finite element numerical modeling tool and the Hoek-Brown failure criterion were used to analyse the stresses and displacements likely to be experienced in the underground excavations. The rock support determined was compared with that indicated using the Q-method. The work has shown that numerical modeling can prove very useful in supplementing the results, provided the input parameters are accurate and take into account both direct measurements and judgment based on experience of the actual ground conditions.
引用
收藏
页码:257 / 266
页数:10
相关论文
共 17 条
[1]  
CHANDRA S, 2008, THESIS NTNU NORWAY
[2]  
DIVATIA E, 1993, DEV GEOTECHNICAL ENG, V74
[3]   Experiences of tunnelling in fragile Himalayan rocks [J].
Goel, RK .
INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2004, 41 (03) :499-500
[4]   TUNNELING THROUGH THE YOUNG HIMALAYAS - A CASE-HISTORY OF THE MANERI-UTTARKASHI POWER TUNNEL [J].
GOEL, RK ;
JETHWA, JL ;
PAITHANKAR, AG .
ENGINEERING GEOLOGY, 1995, 39 (1-2) :31-44
[5]  
Hoek E., 2000, PRACTICAL ROCK ENG
[6]  
*NGI, 1997, ENG GEOL PRACT US Q
[7]  
NILSEN B, 2000, HDB NORWEGIAN GROUP, V2
[8]  
NILSEN B, 1993, HYDROPOWER DEV SERIE, V9
[9]  
NILSEN B, 1992, P ANN TECHN C I SHAF
[10]  
*NTNU, 1B98 NTNU DEP BUILD