Modified cuckoo search algorithm for short-term hydrothermal scheduling

被引:69
作者
Thang Trung Nguyen [1 ]
Dieu Ngoc Vo [2 ]
机构
[1] Ton Duc Thang Univ, Fac Elect & Elect Engn, Ho Chi Minh City, Vietnam
[2] Ho Chi Minh City Univ Technol, Dept Power Syst, Ho Chi Minh City, Vietnam
关键词
Levy flight; Modified cuckoo search algorithm; Non-convex fuel cost function; Short-term hydrothermal scheduling; Water availability constraint;
D O I
10.1016/j.ijepes.2014.10.004
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper proposes a modified cuckoo search algorithm (MCSA) for solving short-term hydrothermal scheduling (HTS) problem. The considered HTS problem in this paper is to minimize total cost of thermal generators with valve point loading effects satisfying power balance constraint, water availability, and generator operating limits. The MCSA method is based on the conventional CSA method with modifications to enhance its search ability. In the MCSA, the eggs are first sorted in the descending order of their fitness function value and then classified in two groups where the eggs with low fitness function value are put in the top egg group and the other ones are put in the abandoned one. The abandoned group, the step size of the Levy flight in CSA will change with the number of iterations to promote more localized searching when the eggs are getting closer to the optimal solution. On the other hand, there will be an information exchange between two eggs in the top egg group to speed up the search process of the eggs. The proposed MCSA method has been tested on different systems and the obtained results are compared to those from other methods available in the literature. The result comparison has indicated that the proposed method can obtain higher quality solutions than many other methods. Therefore, the proposed MCSA can be a new efficient method for solving short-term fixed-head hydrothermal scheduling problems. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:271 / 281
页数:11
相关论文
共 28 条
[1]  
[Anonymous], POWER SYSTEM ANAL OP
[2]  
[Anonymous], 2013, Power generation, operation, and control
[3]   Cuckoo search algorithm for economic dispatch [J].
Basu, M. ;
Chowdhury, A. .
ENERGY, 2013, 60 :99-108
[4]   Artificial immune system for fixed head hydrothermal power system [J].
Basu, M. .
ENERGY, 2011, 36 (01) :606-612
[5]   Hopfield neural networks for optimal scheduling of fixed head hydrothermal power systems [J].
Basu, M .
ELECTRIC POWER SYSTEMS RESEARCH, 2003, 64 (01) :11-15
[6]   Cuckoo Search: A new nature-inspired optimization method for phase equilibrium calculations [J].
Bhargavaa, V. ;
Fateen, S. E. K. ;
Bonilla-Petriciolet, A. .
FLUID PHASE EQUILIBRIA, 2013, 337 :191-200
[7]   Genetic aided scheduling of hydraulically coupled plants in hydro-thermal coordination [J].
Chen, PH ;
Hang, HG .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (02) :975-981
[8]   Improved merit order and augmented Lagrange Hopfield network for short term hydrothermal scheduling [J].
Dieu, Vo Ngoc ;
Ongsakul, Weerakorn .
ENERGY CONVERSION AND MANAGEMENT, 2009, 50 (12) :3015-3023
[9]  
Diniz AL, 2008, POW EN SOC GEN M CON
[10]   A New Multiperiod Stage Definition for the Multistage Benders Decomposition Approach Applied to Hydrothermal Scheduling [J].
dos Santos, Tiago Norbiato ;
Diniz, Andre Luiz .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2009, 24 (03) :1383-1392