A new risk evaluation method for software development project

被引:0
|
作者
Xu, Lin [1 ]
Deng, Mingrong
机构
[1] Zhejiang Univ Technol, Coll Business & Adm, Hangzhou, Zhejiang, Peoples R China
[2] Zhejiang Univ Technol, Coll Management, Hangzhou, Zhejiang, Peoples R China
来源
ISMOT'07: Proceedings of the Fifth International Symposium on Management of Technology, Vols 1 and 2: MANAGING TOTAL INNOVATION AND OPEN INNOVATION IN THE 21ST CENTURY | 2007年
关键词
software development project; risk; triangular fuzzy number; fuzzy comprehensive evaluation;
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In the risk evaluation of software development project, it difficult to quantify risk of software development project accurately due to uncertainty and illegibility of software development risk. Consequently, we present a new method to evaluate the aggregative risks in software development using fuzzy set theory -group hierarchical fuzzy comprehensive evaluation method based on previous researches. This method introduces the triangular fuzzy number to represent experts' judgment information. The key to proposed method is: in view of different effect on cost, schedule. and performance, the loss on the three dimensions are assessed respectively. Based on the assessed values above, the aggregative loss value is obtained by fuzzy comprehensive evaluation method. This algorithm should make the assessment of loss more accurate. On the other hand, simple defuzzifcation algorithm is adopted to simplify complicated operations of triangular fuzzy number. Conclusions are as follows: group hierarchical fuzzy comprehensive evaluation method is valid and reflects the risk characteristics in implementing software development. The proposed method has the following advantages: (1) It combines subjective analysis with quantitative analysis effectively. (2) It takes into account effect on quality, cost, schedule and make information integrated. (3) It does not take a large amount of time to calculate.
引用
收藏
页码:874 / 878
页数:5
相关论文
共 50 条
  • [21] Advisory: Vulnerability analysis in software development project dependencies
    Marquez, German
    Galindo, Jose A.
    Varela-Vaca, Angel Jesus
    Gomez Lopez, Maria Teresa
    Benavides, David
    26TH ACM INTERNATIONAL SYSTEMS AND SOFTWARE PRODUCT LINE CONFERENCE, SPLC 2022, VOL B, 2022, : 99 - 102
  • [22] Method for Developing Catalogs focused on Facilitating the Implementation of Best Practices for Project Management of Software Development in SMEs
    Garcia, Yolanda-Meredith
    Munoz, Mirna
    Mejia, Jezreel
    Martinez, Juan
    Piedad Gasca-Hurtado, Gloria
    Andres Hincapie, Jesus
    PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON SOFTWARE PROCESS IMPROVEMENT (CIMPS 2016): APPLICATIONS IN SOFTWARE ENGINEERING, 2016,
  • [23] A New Group Evaluation Method and its Application in Highway Investment Risk Evaluation
    Zeng, Sheng
    Zhao, Jian
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 382 - 386
  • [24] Application of Fuzzy Comprehensive Evaluation Method Considering Risk Factors in Project Schedule Management
    Yi, Qinglin
    Wu, Juanjuan
    Dai, Tianfan
    ADVANCES IN INDUSTRIAL AND CIVIL ENGINEERING, PTS 1-4, 2012, 594-597 : 2976 - 2981
  • [25] The reliability analysis method of risk evaluation in high-tech venture capital project
    Li, K
    Wang, XH
    Proceedings of the 2005 International Conference on Management Science & Engineering (12th), Vols 1- 3, 2005, : 2445 - 2448
  • [26] Risk Management Technology of Software Project Sustainability in Fuzzy Conditions
    Psoyants, Vladimir G.
    Taganov, Alexandr I.
    Kolesenkov, Aleksandr N.
    Bodrova, Irina V.
    2019 8TH MEDITERRANEAN CONFERENCE ON EMBEDDED COMPUTING (MECO), 2019, : 799 - 802
  • [27] Managing Software Development Projects for Success: Aligning Plan- and Agility-Based Approaches to Project Complexity and Project Dynamism
    Butler, Charles W.
    Vijayasarathy, Leo R.
    Roberts, Nicholas
    PROJECT MANAGEMENT JOURNAL, 2020, 51 (03) : 262 - 277
  • [28] Project risk as identity threat: explaining the development and consequences of risk discourse in an infrastructure project
    Van Os, Annemiek
    Van Berkel, Freek
    De Gilder, Dick
    Van Dyck, Cathy
    Groenewegen, Peter
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2015, 33 (04) : 877 - 888
  • [29] A model of multilevel fuzzy comprehensive evaluation for investment risk of high and new technology project
    Li, Yu-Hua
    Hu, Yun-Quan
    PROCEEDINGS OF 2006 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2006, : 1942 - +
  • [30] The Fixed-Price Contract: A Challenge for the Software Development Project
    Gaebert, Cornelia
    SOFTWARE TECHNOLOGIES, ICSOFT 2014, 2015, 555 : 97 - 112