Production and Inventory Control of Assemble-to-Order Systems

被引:0
|
作者
Saracalioilu, Nisa [1 ]
Sonbahar, Yigit [1 ]
Akdeniz, Guner Asrin [1 ]
Unsal, Meryem [1 ]
Yildiz, Yarkin Yigit [1 ]
Cakmakci, Salih Kaan [1 ]
Bulut, Onder [1 ]
Ozkan, Sinem [1 ]
Hokenek, Ceylin [1 ]
机构
[1] Yasar Univ, Dept Ind Engn, Bornova, Turkey
来源
DIGITIZING PRODUCTION SYSTEMS, ISPR2021 | 2022年
关键词
Assemble-to-order; Simulation optimization; Production-inventory control policy; Rationing policy; Common machine scheduling; POLICY; ALGORITHM;
D O I
10.1007/978-3-030-90421-0_65
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In this study, we consider an Assemble-to-Order (ATO) system with multiple components, common machines, and multiple customer classes. We first identify the research problems related to all the above-mentioned system features. Thereafter, as the solution methodology, we propose different policies for the described problems. We develop a simulation model of the system and benefit from Genetic Algorithm (GA) metaheuristic that finds near-optimal solutions for inventory control and rationing policies. The simulation model of a quite general ATO system that is integrated with a Genetic algorithm provides solutions for several real-life ATO practices.
引用
收藏
页码:757 / 771
页数:15
相关论文
共 50 条
  • [41] A cost-based module mining method for the assemble-to-order strategy
    Chieh-Yuan Tsai
    Chih-Jung Chen
    Yu-Ting Lo
    Journal of Intelligent Manufacturing, 2014, 25 : 1377 - 1392
  • [42] A cost-based module mining method for the assemble-to-order strategy
    Tsai, Chieh-Yuan
    Chen, Chih-Jung
    Lo, Yu-Ting
    JOURNAL OF INTELLIGENT MANUFACTURING, 2014, 25 (06) : 1377 - 1392
  • [43] Response time reduction in make-to-order and assemble-to-order supply chain design
    Vidyarthi, Navneet
    Elhedhli, Samir
    Jewkes, Elizabeth
    IIE TRANSACTIONS, 2009, 41 (05) : 448 - 466
  • [44] Benchmarking non-first-come-first-served component allocation in an assemble-to-order system
    Huang, Kai
    ANNALS OF OPERATIONS RESEARCH, 2014, 223 (01) : 217 - 237
  • [45] Technical Note-Error Noted in "Order-Based Cost Optimization in Assemble-to-Order Systems" by Lu and Song (2005)
    Bolandnazar, Mohammadreza
    Huh, Woonghee Tim
    McCormick, S. Thomas
    Murota, Kazuo
    OPERATIONS RESEARCH, 2019, 67 (01) : 163 - 166
  • [46] Product quality selection: Contractual agreements and supplier competition in an assemble-to-order environment
    Altug, Mehmet Sekip
    van Ryzin, Garrett
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 141 (02) : 626 - 638
  • [47] Product selection and pricing policy of assemble-to-order manufacturer based on heterogeneous demands
    Li Y.
    Huang B.
    Huang H.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2022, 28 (07): : 2263 - 2272
  • [48] Component-based product knowledge modeling and management for assemble-to-order enterprise
    Zhang, JS
    Zheng, SY
    Xue, CF
    Proceedings of the 2005 International Conference on Management Science and Engineering, 2005, : 785 - 792
  • [49] The Research on the Method of Constructing BOM for Small and Medium Assemble-to-Order Manufacturing Enterprises
    Ding, Xiang-hai
    Shi, Jing-jing
    ADVANCED COMPOSITE MATERIALS, PTS 1-3, 2012, 482-484 : 2174 - 2178
  • [50] The Impact of Demand Aggregation Through Delayed Component Allocation in an Assemble-to-Order System
    Bernstein, Fernando
    DeCroix, Gregory A.
    Wang, Yulan
    MANAGEMENT SCIENCE, 2011, 57 (06) : 1154 - 1171