In a staggered erected cable-stayed bridge made of concrete, time-dependent phenomena (such as creep or shrinkage) effects might play an important role in both its geometry and its stress state. In fact, because of these phenomena, stays will indeed lose force and higher bending moments will appear in the structure. To compensate these effects, one or two re-stressing operations are traditionally planned during the life time of long span cable- stayed bridges made of concrete. These re-stressing operations might be technologically challenging and always imply additional costs. To guarantee that allowable stresses and deflections are not exceeded during erection, a number of simulation methods are presented in the literature. Some of these methods, concretely those based on a backward simulation approach, fail addressing the effects of the time-dependent phenomena. To simulate these effects, methods based on the forward simulation approach are traditionally followed. Nevertheless, the main trade-off of these algorithms is that their computation is based on complex iterative processes that make simulation more time consuming. Furthermore, these methods are not able to avoid the need of additional re-stressing operations in service to prevent the effects of the time-dependent phenomena. To fill all these gaps, a new simulation algorithm, the Forward-Direct Algorithm (FDA), is formally presented in this paper to simulate the construction process of cable-stayed bridges including the time-dependent phenomena effects. This algorithm takes advantage of the unstressed length of the stays concept to carry out a computationally efficient simulation based on an innovative direct simulation approach. The major advantage of this algorithm is the fact that the prestressing operations during construction can be defined to avoid the need of additional re-tensioning operations in service. To illustrate the creep and shrinkage effects, the proposed algorithm is applied to a real cable-stayed bridge. This tool also can be used by the designer or the contractor for construction control of the strand by strand tensioning technique.
引用
收藏
页码:813 / 819
页数:7
相关论文
共 50 条
  • [21] Aesthetics of cable-stayed bridges
    Tang, MC
    FIFTH INTERNATIONAL BRIDGE ENGINEERING CONFERENCE, VOLS 1 AND 2: BRIDGES, OTHER STRUCTURES, AND HYDRAULICS AND HYDROLOGY, 2000, 1696 : A34 - A43
  • [22] COMPUTING FOR CABLE-STAYED BRIDGES
    不详
    CIVIL ENGINEERING, 1995, 65 (08): : 14 - 18
  • [23] Construction control simulation for cable-stayed bridges based on geometrically nonlinear analysis l
    Wu, J.
    Frangopol, D. M.
    Soliman, M.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE EXTENSION, 2014, : 1488 - 1493
  • [24] Ultimate Behavior of Steel Cable-Stayed Bridges During Construction
    Kim, Seungjun
    Won, Deokhee
    Kang, Young-Jong
    INTERNATIONAL JOURNAL OF STEEL STRUCTURES, 2019, 19 (03) : 932 - 951
  • [25] GEODESIC SUPPORT OF CONSTRUCTION OF CABLE-STAYED BRIDGES IN THE CITY VLADIVOSTOK
    Bogomolova, E. S.
    Bryn, M. Ya.
    Ivanov, V. N.
    Krashenitsin, D. V.
    Nikitchin, A. A.
    Sergeyev, O. P.
    Tolstov, E. G.
    JOURNAL OF MINING INSTITUTE, 2013, 204 : 33 - 36
  • [26] Ultimate Behavior of Steel Cable-Stayed Bridges During Construction
    Seungjun Kim
    Deokhee Won
    Young-Jong Kang
    International Journal of Steel Structures, 2019, 19 : 932 - 951
  • [27] Correction to: Structural Stability of Cable-stayed Bridges During Construction
    Hong-Jung Kim
    Deok Hee Won
    Young-Jong Kang
    Seungjun Kim
    International Journal of Steel Structures, 2024, 24 : 214 - 214
  • [28] Analysis of cable-stayed bridges during construction by cantilever methods
    Wang, PH
    Tang, TY
    Zheng, HN
    COMPUTERS & STRUCTURES, 2004, 82 (4-5) : 329 - 346
  • [29] Construction monitoring and control of cable-stayed bridges without backstays
    Zheng, Xilong
    ARCHIVES OF CIVIL ENGINEERING, 2024, 70 (04) : 649 - 666
  • [30] Seismic vulnerability and mitigation during construction of cable-stayed bridges
    Wilson, John C.
    Holmes, Keith
    JOURNAL OF BRIDGE ENGINEERING, 2007, 12 (03) : 364 - 372