Integrated Dispatch Model for Combined Heat and Power Plant With Phase-Change Thermal Energy Storage Considering Heat Transfer Process

被引:51
作者
Dai, Yuanhang [1 ]
Chen, Lei [1 ]
Min, Yong [1 ]
Mancarella, Pierluigi [2 ,3 ]
Chen, Qun [4 ]
Hao, Junhong [1 ]
Hu, Kang [4 ]
Xu, Fei [1 ]
机构
[1] Tsinghua Univ, Dept Elect Engn, Beijing 100084, Peoples R China
[2] Univ Melbourne, Dept Elect & Elect Engn, Melbourne, Vic 3010, Australia
[3] Univ Manchester, Sch Elect & Elect Engn, Manchester M13 9PL, Lancs, England
[4] Tsinghua Univ, Dept Engn Mech, Beijing 100084, Peoples R China
基金
中国国家自然科学基金; 国家重点研发计划; 英国工程与自然科学研究理事会;
关键词
Combined heat and power (CHP); flexibility; heat transfer process; power dispatch; thermal energy storage (TES); WIND POWER; OPTIMIZATION; SYSTEMS; CHP; OPERATION; DESIGN; MARKET;
D O I
10.1109/TSTE.2017.2778112
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Combined heat and power (CHP), with its limited flexibility, is one of the leading causes for the curtailment problem of variable renewable energy source (VRES) in Northern China. To increase the flexibility for CHP, thermal energy storage (TES) is considered to be an effective solution, and a phase-change TES demonstration pilot project is now being constructed in Northern China. Almost all the previous studies have modeled the TES device without considering the heat transfer process, which is a main constraint in thermal system analysis. Thus, in this contribution, we consider the heat transfer process for the phase-change TES device installed in a CHP plant based on the steam's three-stage heat transfer model and the entransy dissipation-based thermal resistance theory. An integrated electrical-thermal dispatch model concerning conventional thermal units, VRESs, and CHP units with phase-change TES device is given, and an iteration method for solving this nonlinear programming problem is proposed. Case studies show that it is vital to consider the heat transfer process in the modeling of CHP plant with phase-change TES device, and it has significant influence on the flexibility that the TES device can provide when the working conditions vary.
引用
收藏
页码:1234 / 1243
页数:10
相关论文
共 44 条
[1]  
[Anonymous], 2014, The power of transformation: Wind, sun and the economics of flexible power systems
[2]  
[Anonymous], 2016, IEEE POWER ENERGY SO
[3]  
[Anonymous], 2017, TEST SYSTEM DATA DIS
[4]   Energy storage for mitigating the variability of renewable electricity sources: An updated review [J].
Beaudin, Marc ;
Zareipour, Hamidreza ;
Schellenberglabe, Anthony ;
Rosehart, William .
ENERGY FOR SUSTAINABLE DEVELOPMENT, 2010, 14 (04) :302-314
[5]  
Bergman T. L., 2011, FUNDAMENTALS HEAT MA, P711
[6]   Techno-economic and environmental modelling and optimization of flexible distributed multi-generation options [J].
Capuder, Tomislav ;
Mancarella, Pierluigi .
ENERGY, 2014, 71 :516-533
[7]   Flexible Distributed Multienergy Generation System Expansion Planning Under Uncertainty [J].
Cesena, Eduardo A. Martinez ;
Capuder, Tomislav ;
Mancarella, Pierluigi .
IEEE TRANSACTIONS ON SMART GRID, 2016, 7 (01) :348-357
[8]   Electrical circuit analogy for heat transfer analysis and optimization in heat exchanger networks [J].
Chen, Qun ;
Fu, Rong-Huan ;
Xu, Yun-Chao .
APPLIED ENERGY, 2015, 139 :81-92
[9]   Entransy dissipation-based thermal resistance method for heat exchanger performance design and optimization [J].
Chen, Qun .
INTERNATIONAL JOURNAL OF HEAT AND MASS TRANSFER, 2013, 60 :156-162
[10]  
Chen X., IEEE T POWER SYST