Job performance dimensions for improving final project outcomes

被引:25
作者
Cheng, Eddie W. L.
Li, Heng
Fox, Paul
机构
[1] Queensland Univ Technol, Sch Management, Brisbane, Qld 4001, Australia
[2] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hong Kong, Hong Kong, Peoples R China
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 2007年 / 133卷 / 08期
关键词
D O I
10.1061/(ASCE)0733-9364(2007)133:8(592)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Job performance is argued to be substantially influential to project performance. However, existing construction management literature pays less attention to job performance issues, not to mention exploring the relationship between job performance and project performance. This study therefore aims at examining the effects of job performance on project performance. Four categories (task, behavior, management, and self) of job performance dimensions were extracted by means of an exploratory factor analysis. A hypothesized model is developed, which specifies the relationships between the four job performance categories (independent variables) and overall project performance (the dependent variable). The model was tested using path analysis. Results indicate that the task category of job performance (consisting of nine dimensions) is significantly related to final project outcomes. Specifically, for the success of a project, a construction company must consider how to ensure employees are equipped with such attributes as responsibility, quality of work, ability, job knowledge, experience, efficiency, accuracy, judgment, and initiative.
引用
收藏
页码:592 / 599
页数:8
相关论文
共 60 条
  • [1] Modeling project performance for decision making
    Alarcon, LF
    Ashley, DB
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (03): : 265 - 273
  • [2] American Psychological Association (APA), 1974, STAND ED PSYCH TESTS
  • [3] [Anonymous], INT J PROJECT MANAGE
  • [4] Babin B.J., 1998, Multivariate data analysis, V5th ed.
  • [5] Probabilistic forecasting of project performance using stochastic S curves
    Barraza, GA
    Back, WE
    Mata, F
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (01) : 25 - 32
  • [6] Probabilistic monitoring of project performance using SS-curves
    Barraza, GA
    Back, WE
    Mata, F
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (02): : 142 - 148
  • [7] Bernardin H.J., 1984, Performance appraisal: Assessing human behavior at work
  • [8] Borman W.C., 1993, PERSONNEL SELECTION, P71, DOI DOI 10.1007/SPRINGERREFERENCE_7472
  • [9] Task performance and contextual performance: The meaning for personnel selection research
    Borman, WC
    Motowidlo, SJ
    [J]. HUMAN PERFORMANCE, 1997, 10 (02) : 99 - 109
  • [10] Borman WC, 1997, HUM PERFORM, V10, P67