Numerical construction simulation of cable-stayed bridges

被引:0
|
作者
Zhong, WX [1 ]
Lin, JH [1 ]
Sun, DK [1 ]
机构
[1] Dalian Univ Technol, Inst Engn Res, Dalian, Peoples R China
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In this paper a numerical construction simulation system for cable-stayed bridges is detailed based on the measurement results, with the uncertain parameters being identified, and the state is adjusted by optimizing the designed pre-tension forces of cables during each construction stage. The proposed identification method puts the emphases on the most recent measurement results with the anterior ones being considered simultaneously but less importantly by introducing a "forgetting factor", so that the obtained results will represent the changes of the parameters with time. By taking undeformed pre-tensions as the adjusting means, the structural analysis computation is reduced to the minimum, so the proposed adjustment method is not only clear in concept, but also convenient for operating and therefore effective for guiding the construction process. A simple numerical example is shown which briefly describes the main procedures.
引用
收藏
页码:415 / 421
页数:7
相关论文
共 50 条
  • [1] Simulation of the construction of cable-stayed bridges
    Abraham, DM
    Halpin, DW
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1998, 25 (03) : 490 - 499
  • [2] Construction simulation of cable-stayed bridges
    Lozano-Galant, J. A.
    Xu, D.
    Turmo, J.
    MAINTENANCE, SAFETY, RISK, MANAGEMENT AND LIFE-CYCLE PERFORMANCE OF BRIDGES, 2018, : 813 - 819
  • [4] Reliability of construction control of cable-stayed bridges
    Su, Cheng
    Chen, Zhaoshuan
    Chen, Zhihui
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2011, 164 (01) : 15 - 22
  • [5] Prediction and control of construction of cable-stayed bridges
    Coll. of Arch. and Civil Engineering, South China Univ. of Tech., Guangzhou 510640, China
    Huanan Ligong Daxue Xuebao/Journal of South China University of Technology (Natural Science), 2001, 29 (01): : 14 - 17
  • [6] CABLE-STAYED BRIDGES
    GOLUB, H
    CIVIL ENGINEERING, 1971, 41 (08): : 43 - &
  • [7] CABLE-STAYED BRIDGES
    PODOLNY, W
    ENGINEERING JOURNAL-AMERICAN INSTITUTE OF STEEL CONSTRUCTION INC, 1974, 11 (01): : 1 - 11
  • [8] Innovative Method for the Construction of Cable-Stayed Bridges by Cable Crane
    Yu, Xiangmin
    Chen, Dewei
    STRUCTURAL ENGINEERING INTERNATIONAL, 2018, 28 (04) : 498 - 505
  • [9] Structural stability of cable-stayed bridges during construction
    Hong-Jung Kim
    Deok Hee Won
    Young-Jong Kang
    Seungjun Kim
    International Journal of Steel Structures, 2017, 17 : 443 - 469
  • [10] Construction stages of cable-stayed bridges with composite deck
    Granata, M. F.
    Margiotta, P.
    Arici, M.
    Recupero, A.
    BRIDGE STRUCTURES, 2012, 8 (3-4) : 93 - 106