Quality and quantity of construction and demolition waste in Tehran

被引:54
作者
Asgari, Alireza [1 ,2 ]
Ghorbanian, Tahereh [2 ]
Yousefi, Nader [1 ]
Dadashzadeh, Dariush [2 ]
Khalili, Fatemeh [3 ]
Bagheri, Amin [1 ]
Raei, Mehdi [4 ]
Mahvi, Amir Hossein [1 ,2 ,5 ]
机构
[1] Univ Tehran Med Sci, Sch Publ Hlth, Dept Environm Hlth Engn, Tehran, Iran
[2] Univ Tehran Med Sci, Inst Environm Res, Ctr Solid Waste Res, Tehran, Iran
[3] Minist Hlth, Environm & Occupat Hlth Ctr, Tehran, Iran
[4] Qom Univ Med Sci, Sch Med, Dept Basic Sci, Qom, Iran
[5] Univ Tehran Med Sci, Natl Inst Hlth Res, Tehran, Iran
关键词
Construction and demolition waste; Waste minimization; Recycling; Reuse; Waste management; GENERATION;
D O I
10.1186/s40201-017-0276-0
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Background: In recent years the generation rate of construction and demolition waste (C&D) has significantly augmented. The aim of this study was to assessed the quality and quantity of construction and demolition waste in Tehran (capital of Iran). Methods: Questionnaire methods were used for estimating the amount of generated C&D wastes national statistical data and typical waste generation data. In order to defining the composition of C&D waste, trucks were randomly selected and their wastes were separated and weighted. Results: According to obtained results, about 82,646,051 m(3) of C&D waste (average 16,529,210 m(3) per year) were generated during 2011 to 2016 which only about 26% of them has been recycled. Mixing sand and cement, concrete, broken bricks and soil have the highest amount of the composition of C&D waste in Tehran that was 30, 19, 18 and 11%, respectively. Based on the results, about 2,784,158 t of the waste will generate in 2025 and this is approximately 122% higher than wastes generate in 2016. Based on MAPSA's data, 360 teams of personnel cruise and control the illegal disposals, but due to the expansion of Tehran this number of teams is inadequate and can't be effective in controlling the situation. Conclusion: In general, the overall condition of C&D waste management in Tehran seems undesirable and needs to be updated based on the experience of successful countries in this field.
引用
收藏
页数:8
相关论文
共 33 条
[1]  
[Anonymous], 1995, CONSTR DEM WAST LAND
[2]   Design and construction of engineered municipal solid waste landfills in Thailand [J].
Ashford, SA ;
Visvanathan, C ;
Husain, N ;
Chomsurin, C .
WASTE MANAGEMENT & RESEARCH, 2000, 18 (05) :462-470
[3]   Projection of construction and demolition waste in Norway [J].
Bergsdal, Havard ;
Bohne, Rolf Andre ;
Brattebo, Helge .
JOURNAL OF INDUSTRIAL ECOLOGY, 2007, 11 (03) :27-39
[4]  
Bigom-Musavi Z, 2010, 17 C GEOL ENV ENG IR
[5]  
BRODERSEN J., 2002, Review of selected waste streams
[6]  
Burgoyne D., 2003, CONSTRUCTION DEMOLI
[7]  
Christiansen K.M., 1999, Baseline Projections of Selected Waste Streams: Developments of A Methodology
[8]  
Chun-Li P, 1994, P 1 C CIB TG
[9]   Estimation of regional building-related C&D debris generation and composition: Case study for Florida, US [J].
Cochran, Kimberly ;
Townsend, Timothy ;
Reinhart, Debra ;
Heck, Howell .
WASTE MANAGEMENT, 2007, 27 (07) :921-931
[10]  
Deak A., 2015, Pro Ligno, V11, P38