A Proactive Approach for Simultaneous Berth and Quay Crane Scheduling Problem with Stochastic Handling Time

被引:0
|
作者
Han, Xiao-le [1 ]
Lu, Zhi-qiang [1 ]
Xi, Li-feng [1 ]
机构
[1] Shanghai Jiao Tong Univ, Dept Ind Engn & Management, Shanghai 200240, Peoples R China
来源
CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3 | 2009年
关键词
Berth and Quay Crane Scheduling; Uncertainty; Genetic Algorithm; Stochastic simulation; ALLOCATION PROBLEM; CONTAINER PORT;
D O I
10.1109/ICCIE.2009.5223886
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
For a container terminal system, efficient berth and quay crane (QC) schedules have great impact on the improvement of both operation efficiency and customer satisfaction. In this paper we address both berth and quay crane scheduling problems in a simultaneous way, with uncertainty of container handling time. The berth is of discrete type and vessels arrive dynamically with different service priorities. Besides we assume QCs can move to other berths before finishing processing on currently assigned vessels, adding more flexibility to the terminal system. A mixed integer programming model is established, and a simulation based Genetic Algorithm (GA) search procedure is applied to generate robust berth and QC schedule proactively. Computational experiment shows the satisfied performance of our developed algorithm.
引用
收藏
页码:74 / 79
页数:6
相关论文
共 50 条
  • [1] A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time
    Han, Xiao-le
    Lu, Zhi-qiang
    Xi, Li-feng
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 207 (03) : 1327 - 1340
  • [2] The simultaneous berth and quay crane allocation problem
    Imai, Akio
    Chen, Hsieh Chia
    Nishimura, Etsuko
    Papadimitriou, Stratos
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2008, 44 (05) : 900 - 920
  • [3] A Simultaneous Integrated Model With Multiobjective For Continuous Berth Allocation And Quay Crane Scheduling Problem
    Idris, Nurhidayu
    Zainuddin, Zaitul Marlizawati
    2016 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING, MANAGEMENT SCIENCE AND APPLICATIONS (ICIMSA), 2016,
  • [4] Robust Scheduling for Berth Allocation and Quay Crane Assignment Problem
    Rodriguez-Molins, M.
    Salido, M. A.
    Barber, F.
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
  • [5] Quay crane scheduling for an indented berth
    Lee, Der-Horng
    Chen, Jiang Hang
    Cao, Jin Xin
    ENGINEERING OPTIMIZATION, 2011, 43 (09) : 985 - 998
  • [6] Simultaneous waterway scheduling, berth allocation, and quay crane assignment: A novel matheuristic approach
    Fatemi-Anaraki, Soroush
    Tavakkoli-Moghaddam, Reza
    Abdolhamidi, Dorsa
    Vahedi-Nouri, Behdin
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (24) : 7576 - 7593
  • [7] Simultaneous Optimization of Berth Allocation, Quay Crane Assignment and Quay Crane Scheduling Problems in Container Terminals
    Aras, Necati
    Turkogullari, Yavuz
    Taskin, Z. Caner
    Altinel, Kuban
    OPERATIONS RESEARCH PROCEEDINGS 2012, 2014, : 101 - 107
  • [8] Simultaneous Berth and Quay Crane Allocation Problem in Container Terminal
    Lu, Zhiqiang
    Han, Xiaole
    Xi, Lifeng
    ADVANCED SCIENCE LETTERS, 2011, 4 (6-7) : 2113 - 2118
  • [9] The Influence of the Quay Crane Traveling Time for the Quay Crane Scheduling Problem
    Yang, Kong-hung
    INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTIST, IMECS 2012, VOL II, 2012, : 1298 - 1301
  • [10] Stochastic programming approach for unidirectional quay crane scheduling problem with uncertainty
    Shoufeng Ma
    Hongming Li
    Ning Zhu
    Chenyi Fu
    Journal of Scheduling, 2021, 24 : 137 - 174