Commissioning of the Extended Multi-Frequency ECRH System at ASDEX Upgrade

被引:0
作者
Wagner, D. [1 ]
Stober, J. [1 ]
Kircher, M. [1 ]
Leuterer, F. [1 ]
Monaco, F. [1 ]
Muenich, M. [1 ]
Schubert, M. [1 ]
Zohm, H. [1 ]
Gantenbein, G. [2 ]
Jelonnek, J. [2 ]
Thumm, M. [2 ]
Meier, A. [3 ]
Scherer, T. [3 ]
Strauss, D. [3 ]
Kasparek, W. [4 ]
Lechte, C. [4 ]
Plaum, B. [4 ]
Zach, A. [4 ]
Litvak, A. G. [5 ]
Denisov, G. G. [5 ]
Chirkov, A. [5 ]
Popov, L. G. [6 ]
Nichiporenko, V. O. [6 ]
Myasnikov, V. E. [6 ]
Tai, E. M. [6 ]
Solyanova, E. A. [6 ]
Malygin, S. A. [6 ]
机构
[1] Max Planck Inst Plasma Phys, Boltzmannstr 2, D-85748 Garching, Germany
[2] Karlsruhe Inst Technol, Inst Hochleistungsimpuls & Mikrowellentech, Kaiserstr 12, D-76131 Karlsruhe, Germany
[3] Karlsruhe Inst Technol, Inst Angew Mat AWP, Kaiserstr 12, D-76131 Karlsruhe, Germany
[4] Univ Stuttgart, Inst Grenzflachenverfahrenstech & Plasmatechnol, Pfaffenwaldring 31, D-70569 Stuttgart, Germany
[5] RAS, Inst Appl Phys, 46 Ulyanov St, Nizhnii Novgorod 603950, Russia
[6] GYCOM Ltd, 46 Ulyanov St, Nizhnii Novgorod 603155, Russia
来源
2017 42ND INTERNATIONAL CONFERENCE ON INFRARED, MILLIMETER, AND TERAHERTZ WAVES (IRMMW-THZ) | 2017年
关键词
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Two gyrotrons have recently been installed in the multi-megawatt Electron Cyclotron Resonance Heating (ECRH) system at the ASDEX Upgrade (AUG) tokamak. They are part of a new system that replaces an older ECRH system which was operating since 1996. The new two-frequency gyrotrons operating at AUG at 105 and 140 GHz (10 s pulse length with output powers close to 1 MW) are part of an upgrade with four gyrotrons in total which will double the installed ECRH power at AUG. After completion the system will have around 6.5-7 MW at 140 GHz (or 5.5 MW at 105 GHz) from 8 units available in the plasma during the whole AUG discharge flattop time (10 s).
引用
收藏
页数:2
相关论文
共 50 条
  • [21] Status of the new ECRH system for ASDEX Upgrade
    Leuterer, F
    Grünwald, G
    Monaco, F
    Münich, M
    Schütz, H
    Ryter, F
    Wagner, D
    Zohm, H
    Franke, T
    Dammertz, G
    Heidinger, R
    Koppenburg, K
    Thumm, M
    Kasparek, W
    Gantenbein, G
    Hailer, H
    Denisov, GG
    Litvak, A
    Zapevalov, V
    FUSION ENGINEERING AND DESIGN, 2005, 74 (1-4) : 199 - 203
  • [22] Commissioning of inline ECE system within waveguide based ECRH transmission systems on ASDEX upgrade
    Bongers, W. A.
    Kasparek, W.
    Doelman, N.
    van den Braber, R.
    van den Brand, H.
    Meo, F.
    de Baar, M. R.
    Amerongen, F. J.
    Donne, A. J. H.
    Elzendoorn, B. S. Q.
    Erckmann, V.
    Goede, A. P. H.
    Giannone, L.
    Gruenwald, G.
    Hollman, F.
    Kaas, G.
    Krijger, B.
    Michel, G.
    Lubyako, L.
    Monaco, F.
    Noke, F.
    Petelin, M.
    Plaum, B.
    Purps, F.
    ten Pierik, J. G. W.
    Schuller, C.
    Slob, J. W.
    Stober, J. K.
    Schuetz, H.
    Wagner, D.
    Westerhof, E.
    Ronden, D. M. S.
    EC-17 - 17TH JOINT WORKSHOP ON ELECTRON CYCLOTRON EMISSION AND ELECTRON CYCLOTRON RESONANCE HEATING, 2012, 32
  • [23] OPERATION EXPERIENCE WITH THE ASDEX UPGRADE ECRH SYSTEM
    Leuterer, F.
    Muenich, M.
    Brandl, F.
    Brinkschulte, H.
    Gruenwald, G.
    Manini, A.
    Monaco, F.
    Ryter, F.
    Schuetz, H.
    Stober, J.
    Wagner, D.
    Kasparek, W.
    Gantenbein, G.
    Empacher, L.
    Lechte, C.
    Kumric, H.
    Schueller, P.
    Litvak, A.
    Chirkov, A.
    Denisov, G.
    Fix, A.
    Illin, V.
    Malygin, S.
    Miasnikov, V.
    Nichiporenko, V.
    Popov, L.
    Tai, E.
    Zapevalov, V.
    FUSION SCIENCE AND TECHNOLOGY, 2009, 55 (01) : 31 - 44
  • [24] Experience with the ECRH system of ASDEX-Upgrade
    Leuterer, F
    Beckmann, M
    Brinkschulte, H
    Monaco, F
    Münich, M
    Ryter, F
    Schütz, H
    Empacher, L
    Gantenbein, G
    Förster, W
    Kasparek, W
    Schüller, P
    Schwörer, K
    Borchegowski, A
    Fix, A
    Illin, V
    Popov, L
    Sigalaev, V
    Tai, E
    FUSION ENGINEERING AND DESIGN, 2001, 53 : 485 - 489
  • [25] Progress in the new ECRH system for ASDEX upgrade
    Leuterer, F
    Grünwald, G
    Monaco, F
    Münich, M
    Ryter, F
    Schütz, H
    Wagner, D
    Zohm, H
    Franke, T
    Dammertz, G
    Heidinger, H
    Koppenburg, K
    Thumm, M
    Kasparek, W
    Gantenbein, G
    Denisov, GG
    Litvak, A
    Zapevalov, V
    CONFERENCE DIGEST OF THE 2004 JOINT 29TH INTERNATIONAL CONFERENCE ON INFRARED AND MILLIMETER WAVES AND 12TH INTERNATIONAL CONFERENCE ON TERAHERTZ ELECTRONICS, 2004, : 219 - 220
  • [26] ECRH experiments in ASDEX upgrade
    Leuterer, F
    Günter, S
    Maraschek, M
    Ryter, F
    Suttrop, W
    Wolf, R
    Gantenbein, G
    Zohm, H
    FUSION ENGINEERING AND DESIGN, 2001, 53 : 277 - 287
  • [27] ECRH experiments in ASDEX upgrade
    Leuterer, F
    Gantenbein, G
    Günter, S
    Hobirk, J
    Kirov, K
    Ryter, F
    Wolf, R
    Zohm, H
    RADIO FREQUENCY POWER IN PLASMAS, 2001, 595 : 259 - 266
  • [28] Status, Operation, and Extension of the ECRH System at ASDEX Upgrade
    D. Wagner
    J. Stober
    F. Leuterer
    F. Monaco
    S. Müller
    M. Münich
    C. J. Rapson
    M. Reich
    M. Schubert
    H. Schütz
    W. Treutterer
    H. Zohm
    M. Thumm
    T. Scherer
    A. Meier
    G. Gantenbein
    J. Jelonnek
    W. Kasparek
    C. Lechte
    B. Plaum
    T. Goodman
    A. G. Litvak
    G. G. Denisov
    A. Chirkov
    V. Zapevalov
    V. Malygin
    L. G. Popov
    V. O. Nichiporenko
    V. E. Myasnikov
    E. M. Tai
    E. A. Solyanova
    S. A. Malygin
    Journal of Infrared, Millimeter, and Terahertz Waves, 2016, 37 : 45 - 54
  • [29] Current status of the new ECRH system for ASDEX upgrade
    Wagner, D
    Grünwald, G
    Leuterer, F
    Manini, A
    Monaco, F
    Münich, M
    Ryter, F
    Schütz, H
    Zohm, H
    Franke, T
    Heidinger, R
    Koppenburg, K
    Thumm, M
    Kasparek, W
    Gantenbein, G
    Denisov, GG
    Litvak, A
    Zapevalov, V
    IRMMW-THz2005: The Joint 30th International Conference on Infrared and Millimeter Waves and 13th International Conference on Terahertz Electronics, Vols 1 and 2, 2005, : 24 - 25
  • [30] Beam Quality Measurements at the ASDEX Upgrade ECRH system
    Wagner, D.
    Leuterer, F.
    Plaum, B.
    Schuetz, H.
    Stober, J.
    Thumm, M.
    2024 49TH INTERNATIONAL CONFERENCE ON INFRARED, MILLIMETER, AND TERAHERTZ WAVES, IRMMW-THZ 2024, 2024,