共 29 条
- [1] Acosta I. C. G., 2018, J. Appl. Eng. Sci, V16, P523, DOI [10.5937/JAES16-17696, DOI 10.5937/JAES16-17696]
- [2] Ameen Wadea, 2018, Journal of King Saud University - Engineering Sciences, V30, P243, DOI 10.1016/j.jksues.2018.03.001
- [5] A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR [J]. DECISION SCIENCES, 1986, 17 (03) : 292 - 311
- [8] Chiu S.W., 2019, INT J ENG MODELLING, V32, P1
- [9] Incorporating an expedited rate, rework, and a multi-shipment policy into a multi-item stock refilling system [J]. OPERATIONS RESEARCH PERSPECTIVES, 2019, 6