Multiobjective Permutation Flow Shop Scheduling using MOEA/D with Local Search

被引:0
作者
Chang, Yu-Teng [1 ]
Chiang, Tsung-Che [1 ]
机构
[1] Natl Taiwan Normal Univ, Dept Comp Sci & Informat Engn, Taipei, Taiwan
来源
2016 CONFERENCE ON TECHNOLOGIES AND APPLICATIONS OF ARTIFICIAL INTELLIGENCE (TAAI) | 2016年
关键词
scheduling; permutation flow shop; multiobjective; evolutionary algorithm; decomposition; SIMULATED-ANNEALING ALGORITHM; GENETIC ALGORITHM; MULTIPLE OBJECTIVES; MAKESPAN; MINIMIZE; JOBS; DECOMPOSITION; HEURISTICS; FLOWSHOPS;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper addresses the multiobjective permutation flow shop scheduling problem, where makespan and total flow time are to be minimized simultaneously. We solve the problem by an extended version of the multiobjective evolutionary algorithm based on decomposition (MOEA/D). We investigate the effects of scalarization functions and the replacement mechanism. We also incorporate local search into MOEA/D and investigate design issues including individuals to do local search and resource allocation. Experiments are conducted on 90 public problem instances with different scale, and research findings are reported. Comparing with the state of the art, our algorithm shows competitive performance on small-scale instances and superior performance on medium- and large-scale instances.
引用
收藏
页码:262 / 269
页数:8
相关论文
共 38 条
[21]   Multiobjective Local Search Algorithm-Based Decomposition for Multiobjective Permutation Flow Shop Scheduling Problem [J].
Li, Xiangtao ;
Li, Mingjie .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2015, 62 (04) :544-557
[22]   Minimizing makespan and total flowtime in permutation flowshops by a bi-objective multi-start simulated-annealing algorithm [J].
Lin, Shih-Wei ;
Ying, Kuo-Ching .
COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (06) :1625-1647
[23]   Restarted Iterated Pareto Greedy algorithm for multi-objective flowshop scheduling problems [J].
Minella, Gerardo ;
Ruiz, Ruben ;
Ciavotta, Michele .
COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (11) :1521-1533
[24]   A HEURISTIC ALGORITHM FOR THE M-MACHINE, N-JOB FLOWSHOP SEQUENCING PROBLEM [J].
NAWAZ, M ;
ENSCORE, EE ;
HAM, I .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1983, 11 (01) :91-95
[25]  
Neppalli N. R., 1996, EUR J OPER RES, V95, P356
[26]   A comprehensive review and evaluation of permutation flowshop heuristics to minimize flowtime [J].
Pan, Quan-Ke ;
Ruiz, Ruben .
COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (01) :117-128
[27]   A multi-objective genetic algorithm for scheduling in flow shops to minimize the makespan and total flow time of jobs [J].
Pasupathy, T ;
Rajendran, C ;
Suresh, RK .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 27 (7-8) :804-815
[28]  
Pinedo M., 2002, SCHEDULING THEORY AL
[29]   HEURISTICS FOR SCHEDULING IN FLOWSHOP WITH MULTIPLE OBJECTIVES [J].
RAJENDRAN, C .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 82 (03) :540-555
[30]  
Rajendran C, 2009, STUD COMPUT INTELL, V230, P53