A new set of high-performing heuristics to minimise flowtime in permutation flowshops

被引:42
作者
Fernandez-Viagas, Victor [1 ]
Framinan, Jose M. [1 ]
机构
[1] Univ Seville, Sch Engn, E-41092 Seville, Spain
关键词
Scheduling; Flowshop; Heuristics; Flowtime; SEQUENCING PROBLEM; ALGORITHM; MAKESPAN; SHOPS; JOBS;
D O I
10.1016/j.cor.2014.08.004
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper addresses the problem of scheduling jobs in a permutation flowshop with the objective of total completion time minimisation. Since this problem is known to be NP-hard, most research has focussed on obtaining procedures - heuristics - able to provide good, but not necessarily optimal, solutions with a reasonable computational effort. Therefore, a full set of heuristics efficiently balancing both aspects (quality of solutions and computational effort) has been developed. 12 out of these 14 efficient procedures are composite heuristics based on the LR heuristic by Liu and Reeves (2001), which is of complexity n(3)m. In our paper, we propose a new heuristic of complexity n(2)m for the problem, which turns out to produce better results than LR. Furthermore, by replacing the heuristic LR by our proposal in the aforementioned composite heuristics, we obtain a new set of 17 efficient heuristics for the problem, with 15 of them incorporating our proposal. Additionally, we also discuss some issues related to the evaluation of efficient heuristics for the problem and propose an alternative indicator. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:68 / 80
页数:13
相关论文
共 17 条
[11]   An efficient heuristic for scheduling in a flowshop to minimize total weighted flowtime of jobs [J].
Rajendran, C ;
Ziegler, H .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 103 (01) :129-138
[12]   HEURISTIC ALGORITHM FOR SCHEDULING IN A FLOWSHOP TO MINIMIZE TOTAL FLOWTIME [J].
RAJENDRAN, C .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1993, 29 (01) :65-73
[13]   NEW SEARCH SPACES FOR SEQUENCING PROBLEMS WITH APPLICATION TO JOB SHOP SCHEDULING [J].
STORER, RH ;
WU, SD ;
VACCARI, R .
MANAGEMENT SCIENCE, 1992, 38 (10) :1495-1509
[14]   SOME EFFICIENT HEURISTIC METHODS FOR THE FLOW-SHOP SEQUENCING PROBLEM [J].
TAILLARD, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 47 (01) :65-74
[15]   BENCHMARKS FOR BASIC SCHEDULING PROBLEMS [J].
TAILLARD, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 64 (02) :278-285
[16]   A particle swarm optimization algorithm for makespan and total flowtime minimization in the permutation flowshop sequencing problem [J].
Tasgetiren, M. Fatih ;
Liang, Yun-Chia ;
Sevkli, Mehmet ;
Gencyilmaz, Gunes .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 177 (03) :1930-1947
[17]   DESIGNING A CELLULAR MANUFACTURING SYSTEM - A MATERIALS FLOW APPROACH BASED ON OPERATION SEQUENCES [J].
VAKHARIA, AJ ;
WEMMERLOV, U .
IIE TRANSACTIONS, 1990, 22 (01) :84-97