Allocation of Wind Capacity Subject to Long Term Voltage Stability Constraints

被引:25
作者
Bakhtvar, Mostafa [1 ]
Keane, Andrew [1 ]
机构
[1] Univ Coll Dublin, Sch Elect & Elect Engn, Dublin 2, Ireland
基金
爱尔兰科学基金会;
关键词
Capacity allocation; optimal power flow; sigmoid; tap changer; voltage control; voltage stability; voltage stability constrained optimal power flow (VSCOPF); wind; UNIT COMMITMENT; SYSTEM;
D O I
10.1109/TPWRS.2015.2454852
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Increasing wind capacity integration results in displacement of active power from conventional generators and a reduction in reactive power sources available. As such, voltage stability may become a concern in certain periods for power system operation particularly in weaker areas of the network. Thus, it is of importance to consider the AC constraints for optimal wind generation planning (long term) in order to decrease the possibility of a wind capacity allocation that requires costly remedies from the power system operation perspective (short term). In this work, a procedure is proposed for wind capacity allocation with the aim of benefiting from the potential of an optimal wind capacity allocation for enhancing the voltage stability margin. The procedure is based on a multi operating conditions voltage stability constrained optimal power flow. The wind capacity target is set and the loadability margin is tracked. The results will show the applicability of the proposed procedure and will emphasize the effects of the pattern of wind capacity allocation on the loadability margin. This will result in a wind capacity allocation that enhances the minimum loadability margin among the possible future operating conditions considered for planning. The procedure uses the Maximin concept for this purpose.
引用
收藏
页码:2404 / 2414
页数:11
相关论文
共 20 条
[1]   Where the Wind Blows [J].
Ackermann, Thomas ;
Ancell, Graeme ;
Borup, Lasse Diness ;
Eriksen, Peter Borre ;
Ernst, Bernhard ;
Groome, Frank ;
Lange, Matthias ;
Moehrlen, Corinna ;
Orths, Antje G. ;
O'Sullivan, Jonathan ;
de la Torre, Miguel .
IEEE POWER & ENERGY MAGAZINE, 2009, 7 (06) :65-75
[2]   Optimal Placement and Sizing Method to Improve the Voltage Stability Margin in a Distribution System Using Distributed Generation [J].
Al Abri, R. S. ;
El-Saadany, Ehab F. ;
Atwa, Yasser M. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2013, 28 (01) :326-334
[3]  
[Anonymous], FAC REN
[4]   Equivalency of Continuation and Optimization Methods to Determine Saddle-Node and Limit-Induced Bifurcations in Power Systems [J].
Avalos, Rafael J. ;
Canizares, Claudio A. ;
Milano, Federico ;
Conejo, Antonio J. .
IEEE TRANSACTIONS ON CIRCUITS AND SYSTEMS I-REGULAR PAPERS, 2009, 56 (01) :210-223
[5]  
Bakhtvar M., 2013, P IEEE CICC, P1
[6]   Maximizing Firm Wind Connection to Security Constrained Transmission Networks [J].
Burke, Daniel J. ;
O'Malley, Mark J. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2010, 25 (02) :749-759
[7]   Security-constrained unit commitment with AC constraints [J].
Fu, Y ;
Shahidehpour, M ;
Li, ZY .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (03) :1538-1550
[8]   The IEEE reliability test system - 1996 [J].
Grigg, C ;
Wong, P ;
Albrecht, P ;
Allan, R ;
Bhavaraju, M ;
Billinton, R ;
Chen, Q ;
Fong, C ;
Haddad, S ;
Kuruganty, S ;
Li, W ;
Mukerji, R ;
Patton, D ;
Rau, N ;
Reppen, D ;
Schneider, A ;
Shahidehpour, M ;
Singh, C .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (03) :1010-1018
[9]   Coordinating Large-Scale Wind Integration and Transmission Planning [J].
Gu, Yang ;
McCalley, James D. ;
Ni, Ming .
IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2012, 3 (04) :652-659
[10]   Security-constrained unit commitment for simultaneous clearing of energy and ancillary services markets [J].
Li, ZY ;
Shahidehpour, M .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (02) :1079-1088