Wrong, but not failed? A study of unexpected events and project performance in 21 engineering projects

被引:11
|
作者
Wied, Morten [1 ]
Oehmen, Josef [1 ]
Welo, Torgeir [2 ]
Pikas, Ergo [3 ]
机构
[1] Tech Univ Denmark, Engn Syst Design, DTU Management, Lyngby, Denmark
[2] Norwegian Univ Sci & Technol, Dept Mech & Ind Engn, Trondheim, Norway
[3] Tallinn Univ Technol, Dept Civil Engn & Architecture, Tallinn, Estonia
关键词
Uncertainty; Resilience; Complex projects; RESILIENCE; MANAGEMENT; RISK; UNCERTAINTY; COMPLEXITY;
D O I
10.1108/IJMPB-08-2020-0270
中图分类号
F [经济];
学科分类号
02 ;
摘要
Purpose Most complex engineering projects encounter unexpected events through their life cycle. These are traditionally attributed to inaccurate foresight and poor planning. Outlining a nonanticipatory alternate, the authors seek to explain the ability to rebound from unexpected events, without foresight, using resilient systems theory. This paper seeks to outline the theoretical underpinnings of project resilience and to identify criteria for planning and selecting projects for greater resilience. Design/methodology/approach Investigating project resilience, this paper studies the relationship between unexpected events and project performance in 21 projects. The authors perform a systematic review of project ex post evaluations 3-12 years after project completion. Findings First, the authors find that all projects encountered unexpected events, even when discounting planning error. Second, the authors show that, as a consequence, projects underperformed, not necessarily relative to formal criteria, but in terms of subjective opportunity cost, that is, relative to competing alternates - known or imagined - foregone by their implementation. Finally, the authors identify four types of resilient projects - superior, equivalent, compensatory and convertible projects - as opportunities for building project resilience. Practical implications The properties of resilient projects provide opportunities for building resilience in complex projects. Originality/value Departing from traditional efforts to "de risk" plans and "de-bias" planners, this paper focuses on the properties of projects themselves, as an alternate to improved foresight and up-front planning.
引用
收藏
页码:1290 / 1313
页数:24
相关论文
共 4 条
  • [1] Achieving ambidexterity in large, complex engineering projects: a case study of the Sutong Bridge project
    Liu, Li
    Wang, Xuerong
    Sheng, Zhaohan
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2012, 30 (05) : 399 - 409
  • [2] Simultaneous Pursuit of Innovation and Efficiency in Complex Engineering Projects-A Study of the Antecedents and Impacts of Ambidexterity in Project Teams
    Liu, Li
    Leitner, David
    PROJECT MANAGEMENT JOURNAL, 2012, 43 (06) : 97 - 110
  • [3] Project control system (PCS) implementation in engineering and construction projects: an empirical study in Saudi's petroleum and chemical industry
    Jawad, Sahar
    Ledwith, Ann
    Khan, Rashid
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2022, 31 (13) : 181 - 207
  • [4] Improving Design by Partnering in Engineering-Procurement-Construction (EPC) Hydropower Projects: A Case Study of a Large-Scale Hydropower Project in China
    Liu, Yang
    Tang, Wenzhe
    Duffield, Colin F.
    Hui, Felix Kin Peng
    Zhang, Lihai
    Zhang, Xuteng
    Kang, Yanling
    WATER, 2021, 13 (23)