A practicality and safety-oriented approach for path planning in crane lifts

被引:31
作者
Hu, Songbo [1 ]
Fang, Yihai [1 ]
Guo, Hongling [2 ]
机构
[1] Monash Univ, Dept Civil Engn, Clayton, Vic, Australia
[2] Tsinghua Univ, Dept Construct Management, Beijing, Peoples R China
关键词
Crane lifts; Lift path planning; Safety; Visibility; Collision; Motion coordination; CONSTRUCTION; VISUALIZATION; OPTIMIZATION; ALGORITHM;
D O I
10.1016/j.autcon.2021.103695
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Safe and efficient operations of cranes in complex construction environments require thorough planning of lift paths. As the scales of construction projects expand, path planning becomes excessively sophisticated and laborious using conventional practices where lift paths are verified manually. This study proposes a novel practicality and safety-aware path planning method for single crane lifting scenarios, which defines and incorporates key practicality considerations in a sampling-based path planning algorithm. An RRT*-based algorithm is proposed and validated via a case study of real-world lift jobs. Results indicate that the proposed method significantly improved the path quality in terms of practicality considerations without compromising computational efficiency. The proposed method is promising in generating operable and realistic paths that can be practically executed by crane operators. It is expected to advance the knowledge and practice in automated crane lift planning, allowing for more informed prediction and management of on-site activities involving the use of cranes.
引用
收藏
页数:13
相关论文
共 51 条
[21]   Barriers to promoting prefabricated construction in China: A cost-benefit analysis [J].
Hong, Jingke ;
Shen, Geoffrey Qiping ;
Li, Zhengdao ;
Zhang, Boyu ;
Zhang, Wanqiu .
JOURNAL OF CLEANER PRODUCTION, 2018, 172 :649-660
[22]   Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming [J].
Huang, C. ;
Wong, C. K. ;
Tam, C. M. .
AUTOMATION IN CONSTRUCTION, 2011, 20 (05) :571-580
[23]  
Huang L., 2018, P COMPUTER GRAPHICS, P211, DOI DOI 10.1145/3208159.3208186
[24]   Strategies to accelerate the computation of erection paths for construction cranes [J].
Hung, Wei-Han ;
Liu, Chin-Wei ;
Liang, Ci-Jyun ;
Kang, Shih-Chung .
AUTOMATION IN CONSTRUCTION, 2016, 62 :1-13
[25]   Three-Dimensional Simulation and Visualization of Crane Assisted Construction Erection Processes [J].
Kang, Shih-Chung ;
Chi, Hung-Lin ;
Miranda, Eduardo .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2009, 23 (06) :363-371
[26]   Planning and visualization for automated robotic crane erection processes in construction [J].
Kang, ShihChung ;
Miranda, Eduardo .
AUTOMATION IN CONSTRUCTION, 2006, 15 (04) :398-414
[27]   Crane operation planning in overlapping areas through dynamic supply selection [J].
Khodabandelu, Ali ;
Park, JeeWoong ;
Arteaga, Cristian .
AUTOMATION IN CONSTRUCTION, 2020, 117
[28]  
Kuffner J. J. Jr., 2000, Proceedings 2000 ICRA. Millennium Conference. IEEE International Conference on Robotics and Automation. Symposia Proceedings (Cat. No.00CH37065), P995, DOI 10.1109/ROBOT.2000.844730
[29]  
Lavalle SM, 2006, Planning Algorithms
[30]   Algorithm for Mobile Crane Walking Path Planning in Congested Industrial Plants [J].
Lei, Zhen ;
Han, SangHyeok ;
Bouferguene, Ahmed ;
Taghaddos, Hosein ;
Hermann, Ulrich ;
Al-Hussein, Mohamed .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2015, 141 (02)